Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

All roads lead to Rome, the viaduct scaffolding househoid low scaffold for viaduct low aluminum alloy ladder low wheel scaffold - Jiangsu Sh

by:Shizhan     2020-09-28
Viaduct scaffold erection process for: grading, compaction & rarr; Equipped with material & rarr; Positioning set base & rarr; Vertical sweeping bar & rarr; Stud & rarr; Horizontal sweep pole & rarr; Small bar & rarr; The ledger & rarr; Bracing & rarr; Even the wall bar & rarr; Block scaffolding & rarr; Mr. Guard railing & rarr; Mr. Stability from positioning: in accordance with the requirements of structure around the building with feet measure by stud walls from outside, and make tags. Plate, the base shall be positioned accurately on the line, smooth plate need to be laid, shall not be suspended. In the process of erection of the first layer of the scaffold, along every frame around with an inclined support, two-way open around the corner, for the parts of the scaffold pole reliable connection with the main structure of the wall is removed. When even higher than that of viaduct scaffolding operational layer wall a step or two, temporary stability measures should be taken, until even set-up is a rear wall can be removed. Double bent frame should be made in the first row of poling, stand outside after poling. Poling appropriate to put two in each row, again standing in the middle of the root, look after each other, stand in the middle part of the stud. Double bent inner and outer row promulgation and pole attachment with vertical metope. Vertical stem extension, appropriate to stand outside, after stand in line. Jiangsu Shizhan scaffolding engineering co. , LTD. Offers all kinds of scaffolding and scaffolding leasing, welcome everybody to choose! The article comes from: http://www. atjsj。 com/products- 细节。 asp吗? Cpid = 32, reproduced please indicate.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...