Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

And scaffolding, safety technical clarificaiton - Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shiz

by:Shizhan     2020-09-01
Indoor and scaffolding, should be strictly in accordance with the requirements of construction organization design, authors. And scaffolding of longitudinal and transverse distance should not be greater than 2 m. And the scaffold should set up facilities, ensure the safety of the operating personnel. The operational layer should be put with bamboo basketry, there shall not be empty. Must be left empty, should set up a fence protection. Large bar within the scaffold, step layer on both sides of the operation, should establish protective barrier protection. Interval, and the scaffold should be controlled within 2 m, must be higher than 2 m, technical measures should be protected. The diagonal (should be adopted for the full scaffolding of the solid Bracing) Protection. And the scaffold is unfavorable use steel, bamboo was mixed.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...