Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Architectural aluminum alloy scaffolding - general requirements Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan

by:Shizhan     2020-09-05
Building as solid frame, aluminum alloy scaffolding main role is to make workers in solid structures, decorate a house, there are pull rod to cooperate to improve facilities ( Cantilever bar) , hoist, hoist, stage, hanging basket, basket, etc. According to construction technical characteristics of the aluminum alloy scaffolding to choose these facilities, to form a complete set. Installation and use hoisting frame, should pay attention to the following: 1. Architecture is a lattice structure, which has good rigidity and working stability. Wherever there is condition, hoisting frame should first choose type aluminum alloy scaffolding. Fastener type steel tube building the integrity and stability of the scaffold is bad, be careful while using it. If need to use, should calculate and determine the large lifting capacity, and strictly according to provisions of structure selection bar, at the same time, strictly implement the corresponding safety technical specifications. Wood construction scaffolding is now less use, when the conditional, can be used for height is not high and the small load. Currently has almost no more than four years living in line with the requirements of the bamboo, around the construction site and therefore have no bamboo poles for hoisting frame. 2. The basis of the steel construction scaffolding should be handled according to the design requirements. If the design did not make clear requirements, should be leveling cement, water C20 concrete, thickness of not less than mm, surface roughness deviation is not more than 10 mm. 3. Cable wind rope should use steel wire rope, unfavorable use steel instead of. When a construction aluminum alloy scaffolding height is higher in the middle add cable wind rope, cable wind rope pull contact will be strengthen treatment, lest pillar was bent cable wind rope anchor to independent setting, don't pull on the temporary structures of unreliable, also cannot pull on the trees, pole, or other construction scaffolding. 4. Aluminum alloy scaffolding installed, to do the load test ( General test load over using load times) Can be used, acceptance
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...