Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Attached type lifting scaffolding used should comply with the regulations of what? - Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu s

by:Shizhan     2020-09-06
1, should be carried out in accordance with the design performance index using, shall not be extended arbitrarily use scope; Construction loads on the frame body must comply with the design rules, shall not be overloaded, shall not be placed on concentrated load and the safety of the local bar. 2, construction waste in the body and debris should be cleaned in time. 3, adhesive lifting scaffolding in use process may not be the following operations: 1) Use the frame body lifting material; 2) Rachel hoisting rope on the frame body ( Or cable) ; 3) On the shelf cart; 4) Any demolition structures or loose connections; 5) Dismantle or mobile rack body of safety protection facilities; 6) Use the template or unloading platform supported frame body; 7) Other affecting the safety of the frame body.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...