Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Button scaffold design, structural requirements - Golden lake - button scaffold factory Industry dynamic - - aluminum alloy scaffolding manufacturer Focus on the work high above the

by:Shizhan     2020-08-30
Golden plate fastener scaffold factory contact number: 18420150310 takeaway: due to the usual work practice, have friends often ask questions about the button scaffold construction specifications, there is a lot of problems representative, today to arrange, for people need to study and reference. Welcome to correct thenceforth. Socket type plate fastener type steel tube scaffold safety technical codes using Q345B plate button scaffolding poling materials of low carbon alloy steel, its bearing capacity is far greater than other scaffolding, at the same time as a diagonal specifications, brace effect, and the unique self-locking button type design, both bearing capacity and high security. So in the template support and other operating aircraft engineering, the design of the concrete, structural requirements for just contact is crucial, the following is button scaffold is applied in engineering design of formwork and scaffolding two tectonic interpretation. Button scaffold formwork support frame button scaffold for template support system, what are the requirements for structure? 1. In the template support system, the template bracket height should not be more than 24 m, more than 24 m, shall be separately designed. Note: ( Is not more than 24 m, in fact, 48 series button scaffold ChanLi rod bearing can reach 10 tons, so more than 24 m, a separate design, safety no problem) 。 2. The erection height within 8 m and templates support, interval should not be more than 1. 5m。 3. Erection of over 8 m high template scaffold, vertical diagonal should be spread across Settings, horizontal bar interval shall not be greater than 1. 5 m, the height of every 4 ~ 6 standard interval should be set the horizontal layers diagonal or fastener steel pipe bracing, surrounding structures, appropriate is reliable and the surrounding structure formation Rachel. 4. When the template support build-up to form a lateral Rachel's independent tower, each side frame body, where every step should be a vertical diagonal. 5. For a long strip of high formwork and the ratio of the total height and the width of the frame body H/B should not be more than 36. Tall template bracket at the top level rod should narrow interval than the standard interval a button spacing. 7. Template support adjustable base adjustment screw exposed length should not be greater than 300 mm, as sweeping the floor level of the bottom of the rod, ground height should not be greater than 550 mm8. When the pedestrian within the template bracket set, if the channel width and single horizontal bar are the same as wide, but indirect smoke in addition to the first floor horizontal and diagonal, vertical diagonal channels on both sides of the vertical bar should be set. If the channel width and single level different width, should be set up on the upper channel support beams. On both sides of the hole at the top of the protective plate should be laid closed, should set up a safety net. Through the hole of the motor vehicle, you must set up security warning and anti-collision facilities. Panel button scaffolding, double xenophobic scaffolding, what are the requirements for structure? Disc button scaffolding, double exclusive frame plate button scaffolding, double bent frame 1. With disk button scaffolding, double row scaffolding, erection height should not be more than 24 m. Can choose according to the requirement frame body geometry size, the adjacent level interval appropriate chooses 2 m, poling longitudinal distance appropriate chooses 1. 5 m or 1. 8 m, and should not be greater than 2. 1 m, poling horizontal spacing should be 0. 9 m or 1. 2平方米。 Button scaffold first poling appropriate USES different length of poling staggered, wrong to open bar vertical distance should be not less than 500 mm, stud should be configured at the bottom of the adjustable base. 3. When set up double row scaffolding pedestrian passageway should be set up on the upper channel support beams, channels on both sides should be added a diagonal. On both sides of the hole at the top of the protective plate should be laid closed, shall set up safety net; Through the hole of the motor vehicle, you must set up security warning and anti-collision facilities. 4. Each step of double row scaffolding horizontal layer, when no hooks to steel scaffolding to strengthen horizontal layer stiffness, should every five diagonal cross set level. 5. Wall with dishes with scaffold facade and wall should be kept vertical, the same layer of the wall should be in the same plane, should not be greater than 3 across horizontal spacing, distance from the lateral aspect of the main structure should not be greater than 300 mm. Even wall pieces should be set in a horizontal bar button next to the node, points to the button node distance should not be greater than 300 mm, the adoption steel pipe fastener do even the wall bar, appropriate USES right-angle fastener with button bar connection. 6. Homework layer button scaffold lateral should set foot, guardrails, and should be facade hung on the outside of the scaffold dense mesh net; Protective railings distance operation layer height, 500 mm, 1000 mm set two way. Golden button scaffold factory
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...