Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Button type steel pipe support introduction - socket The company dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan security

by:Shizhan     2020-09-07
Shenzhen tengda scaffolding engineering co. , LTD. , professional scaffolding manufacturer, from professional perspective, illustrates the socket you buckle the installation of the steel pipe support point: socket fastener type steel tube scaffold is an essential part of the construction equipment and technique, the scaffold is essential for high worker supply operation conditions, to ensure that the construction of external protection supplies. According to the standard purchase, according to the standards, will leave safety hazards, there will be trouble. How to make the socket fastener type steel tube scaffold become more important to safety guarantee. To make sure that the socket fastening steel pipe support installation standards, safety, and firmly, must meet the demand of construction, together before stent set up, according to the characteristics of construction and construction technology, determine the bracket installation, complexing plan, consider fundamental floor disposal, when plans must also be production base, installation requirements, component distance, ladder, pull the node ( Soft wall) The setting of the direction, connection method, construction details and large sample. In addition, the fastener type steel tube scaffold socket installation height more than standard rules, the need to review. Installation height can not too high, usually not more than 50 m, scaffold built too unsafe, also not economic. More than 24 m, to strengthen the base in the structure of the whole stiffness and stability. For example, if the vertical support successively set up the scissors, horizontal scissors in added support, soft wall ( Pull the node) The corresponding development of the strength and the distance can also be reduced. Installation height of more than 50 meters, you can use double rod 13 mxa or encrypted signed distance, using segmented discharge or panel method, transfer the scaffolding load of the each segment commitment to building structures, but need a description of the accounting.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...