Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Cantilever beams attached scaffolding demolition security technical clarificaiton - counter loop wire rope Industry dynamic - - aluminum alloy scaffolding manufacturer Focused on the work high above the flat

by:Shizhan     2020-08-25
A, 1, all safety management for construction personnel must wear a good helmet, likewise, fasten good and proper use of personal labor protection articles, tools must be loaded tool bag; Must observe the safety discipline. Scaffolder show certificates, no drunken work and germs. 2, scaffolding attached dismantled before, by the project department engineering and technical personnel and professional scaffolding safety personnel to the operators of attached dismantle safety technical disclosure, and organize the operation personnel familiar with the attached parts seriously scaffolding, master to dismantle the point. 3, dismantle field must be set up warning region, hanging eye-catching warning signs, operators are strictly forbidden in the alert area of the passage or scaffold below continue to organize the construction. Ground care workers must perform their duties, high-rise building scaffolding removed, device shall be equipped with good communication. 4, dismantle scaffold materials piled up on the scaffolding or platform, shall not be overloaded. To cut down the bolt into the tool bag, remove the fastener to conveniently in fasteners cage. To prevent from steel basketry roll down a piece of cuts. Tear open come down to the steel pipe, steel basketry with a rope tied, with the tower crane lifting down, steel pipe should be according to the length of pile, lifting, length mixed lifting shall be strictly prohibited. 5, all high homework personnel, should be in strict accordance with the high operation regulations and to observe the safety discipline, remove the process requirement. Building lock all the Windows must be closed in the body, not allowed to open or to the overhanging objects. Street to dismantle scaffold, lateral hurt due to prevent falling objects protection measures. 6, after the demolition of personnel into the post, first check to reinforce the loose parts, clear steps within the layer of material, objects and garbage. Clear all things should be safety to the ground, it is strictly prohibited to high toss. On 7, according to the set-up of the program, the safety net & rarr; Out feet & rarr; Protective railings & rarr; Joist & rarr; Diagonal member, even the wall bar & rarr; The ledger & rarr; Small bar & rarr; Stud. Do not allow the discrete surface to dismantle or upper and lower two step removed at the same time, Step type) 。 Seriously do it step by step. All the wall rod, diagonal member, row insulation measures, step up measures must with scaffolding layer removed a simultaneous decline. No first dismantled. All 8, rods and fasteners, in dismantling should be separated, do not allow the pole pieces of the attached fastener conveying the ground, or two at the same time remove the ground. All within the file protection, should be erected in the outgoing, carry, prevent from inside out, after the file protection within the garbage objects directly from the fall on the cuts. 9, scaffolding to beams attached to clean up the trash in the sealing plate, and then dismantle the seal plate, remove the material must be neatly stacked on the floor. 10, beams attached to dismantle to use gas cutting process, should be strictly in accordance with the requirements of the national special type of work and fire regulations. Must have fire prevention measures and personnel guards, equipped with hopper ( Barrels a day). To prevent Mars and splash down gas cutting. It is forbidden to unlicensed use hange tools. 11, cutting welding stud scaffolds shall be at the top of i-steel is a worker to catch cut steel tube, welder, operators must use your seat belt, achieve high low with roots firmly. 12, all beams attached to the wall welded steel pipe are removed after clean, can remove the i-steel. To dismantle the embedded parts of i-steel root, nuts, washers is dismantled embedded parts will beams to the floor, then dismantle counter loop of wire rope. 13, under the same operating methods to dismantle a beams, demolition of the limb end must timely erection of guardrails and a safety net. 14, after the completion of the day, should carefully check posts around the situation, such as finding hidden danger of the position, should be repaired in time or to finish to a program, a part of the end, may leave post. Second, the environment/occupational health and safety precautions: 1, special climate, such as strong winds and heavy rain should not be for the removal of scaffolding. The demolition of homework, night should have good lighting. 2, the use of oxygen, acetylene should be in strict accordance with the specification requirements, when used for the distance between the two bottles of 5 meters, away from open flame operation for 10 meters, not to use barrier. When cutting steel and welding should pay attention to fire prevention, and open when hot. All operators of burns. When cutting steel tube, should beware of short steel tube falling, especially in the temporary scaffolding parts over the road. Protective measures should be taken, using fire sand basin, etc. 3, human and transfer beams, delivery personnel position should be staggered, do not allow the up and down on the same straight line operation, it is forbidden to upwards or downwards disorderly throw thing such as materials and tools, tools should be handy, do to secure stability. 4, all operators use shall not be arbitrarily discarded waste with oil gloves, should be thrown to the designated bin. Welders should be equipped with protective masks and wear a good welding gloves, shoes and wear protection. 5, i-steel surface is garbage and rust, operation should pay attention to protect themselves and the surrounding other operators, garbage and rust prevention flying eye injury, pollute the air. Welder welding electrical sparkle during keep out measures to prevent welding spark injures others. 6, if there is a leak place please team leader do targeted added. Supervision witness: clarificaiton signature: date: year month day
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...