Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Console scaffold bracing and transverse brace rules - Shandong insulating glass fiber scaffold wholesale - folding mobile Industry dynamic - Aluminum alloy scaffolding factory

by:Shizhan     2020-09-02
Shandong folding mobile fiberglass insulation scaffolding wholesale and contact phone number: 18420150310 console scaffold bracing and transverse brace rule 1, fastener type steel pipe scaffold bracing should be along the whole high Settings. High frame under 24 m, jiangmen forklift maintenance, can be set up along the scaffolding interval length is not more than 15 m; High rack for more than 24 m should be along the scaffold have set the bracing, and should be set transverse brace, transverse brace from the bottom of the frame to support a word after arrangement, the geographical model, 6 set across a distance along the length of scaffolding. 2, bowl type steel pipe scaffold, aluminum sunflower radiator, rack high under 24 m, diagonal in lateral sash 1/5 of the total; For more than 24 m high, according to the set diagonal sash 1/3 of the total. 3, door type steel pipe scaffold table next to two side should full cross support rod, when the aircraft more than 20 m high, should also be along the length and height have set on the outside of scaffold bracing, automatic tapping machine, bracing steel to steel pipe scale together with the door frame. When the bracing tube diameter and the door frame steel pipe diameter was not unique, should adopt special fastener connection. Along 4, a bunch of fastener type steel pipe scaffold scaffold laterally adjacent vertical bracing and core setting, when the scaffold is higher than 4 m, second-hand gas turbine generator, should also be along the scaffold bracing height set a degree every two steps. Shandong folding mobile fiberglass insulation scaffolding wholesale
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...