Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

【 Construction scaffolding 】 Responsible for your safety. . . Jiangsu Shizhan scaffolding engineering co. , LTD

by:Shizhan     2020-09-29
We know that any building materials in the use of a focal point to pay attention to the correct way to its use, only in this way. We can ensure our personal safety, below small make up is simple and everybody know about the scaffolding in the attention of the scaffolding method ~! ! ! 1, before the scaffold erection, shall be determined according to the characteristics of the type of work and the construction technology of the erection plan, content should include: set-up requirements, distance between bar and foundation treatment, even the wall pole position setting, connection methods, and map drawing and details. 2, scaffolding, authors calculated height more than rules. ( 1) Fastener type steel pipe scaffold erection size in the table below, the corresponding bar can no longer to carry on the design calculation. But even the wall and poling foundation bearing capacity should be based on the actual load such as design calculation and drawing construction drawing. ( 2) When the erection height in 25 to 50 m, deal with scaffolding to strengthen overall stability from the structure. Continuous Settings, such as longitudinal bracing need increase the lateral bracing, even the wall rod strength increase, narrow spacing, and in windy areas for the scaffold erection height more than 40 m, considering the wind vortex over power, should be in the set level even the wall at the same time, should also rise over flow resistance role even wall measures, to ensure the safety of the use of scaffolding. ( 3) When the erection height more than 50 m, can adopt double stud strengthen or by subsection unloading, along the high block the scaffolding and scaffolding full use wire rope hanging beam slab structure, the scaffolding, part of the load to the building; Set-up, or by subsection will paragraphs scaffolding to load borne by building out of the cantilever beam, frame, and the design calculation. ( 4) To the design and calculation of scaffold need in conformity with the relevant provisions of the scaffolding of the specification, and the enterprise technical director for approval. 3, scaffolding construction scheme should be consistent with construction site erection of scaffolding types, when field so change scaffold types, need to modify the scaffold scheme and after examination and approval, before the construction. Key words: construction scaffolding
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...