Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Construction scaffolding sequentially tear open outfit, construction scaffolding, construction steel pipe scaffolding, scaffold - Jiangsu Shizhan scaffolding

by:Shizhan     2020-09-28
Construction scaffolding, http://www. atjsj。 Com dismantling should, according to the principle of loading after first open: (according to the following procedure 1) From across the edge tear open at the top of the armrest and baluster at first, and then dismantle scaffold board ( Or horizontal frame) And escalators, and unload horizontal rod reinforcing rod and bracing. ( 2) Since the top edge began to remove cross sustaining, synchronous remove the top bracing rod with the wall top door frame. ( 3) Continue to step phase synchronization under demolition of door frame and accessories. Scaffold free cantilever height shall not exceed three steps, or shall provide temporary Rachel. ( 4) To remove the continuous synchronization. For even the wall rod rod, scissors, long horizontal, need the dismantling scaffolding to relevant across the door frame, before dismantling. ( 5) Demolition of sweeping bar, the bottom door frame and sealing bar. ( 6) Demolition of base plate and pad.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...