Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Construction scaffolding some experience to share to you, for you have mo Zhuhai high aluminium alloy folding scaffold - Industry dynamic - Aluminum alloy scaffold

by:Shizhan     2020-09-05
Zhuhai high aluminium alloy folding scaffold contact phone number: 18420150310 today to introduce the matters needing attention in the process of construction scaffolding in the field of application! This account is published articles in the field of architecture, is interested in, the others don't importune. The first and other crap, but still have to emphasize, erection of high-level scaffolding, adopted by the various materials must meet the quality requirements, this is for your own safety. Article 2: high-level scaffolding foundation must be strong, before the erection of the computation, satisfies the requirement of load, and according to the construction specification build-up, completes the drainage measures, scaffolding, technical requirements should comply with the regulations of relevant specification. Must attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement. Article 3: the level of closed, should be the first step, every step or two step, be put with scaffolding plank hand or foot basketry, scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board. And in every four step laid between stud and metope system bottom has long security. Vertical closed, steps from the second to fifth, each step must be in the outside vertical rod side set 1. 00 m high protective railings and pedal or set up network, protective pole ( Network) With the stud pin down; Step 5 above in addition to the set a guard rail, set net should be all set its safety or security; In concentration areas or residents along the street, it should be the second step, the outside all set net set its safety or security. Article 4: the scaffolding should be higher than the top of the building or operating level 1. More than 5 m, and added a palisade. Of scaffold erection of steel pipes, fasteners, scaffolding and connections shall not be arbitrarily dismantled. Construction when necessary, must be subject to consent by the site, head, and take effective measures to process is completed, immediately recover. Article 5: the scaffold before use, should by the examination and acceptance of construction site, head of the organization, and present the single fill in the acceptance of rear can use. In construction process should have professional management, inspection and maintenance, and regular settlement observation, found abnormal should take timely reinforcement measures. Article 6 the scaffolding demolished, should first check connections and buildings, and the remaining on the scaffold material, debris and other clean, from top to bottom, according to the loading before, after the first open order, demolition of the material should be unified transfer or hanging down to the ground, step by step. Not allowed to step down the method, it is forbidden to throw down or push ( Pull) Method of demolition. Take down the scaffolding, alert zone should be set up, and hold people alert. In case of more than 6 wind and bad weather, should stop scaffolding demolition work. Article 7: the demand for the foundation, the foundation is not normal, please use the controllable pitch base feet, equilibrium. The foundation must be capable of scaffolding and work under pressure. Article 8: the staff building and high altitude work must wear a seat belt, work area around please install safety net, prevent weight drops, injuring others. Scaffolding components, accessories are strictly prohibited in the process of transportation, storage serious fall off, hit; Lap, tear open outfit, it is strictly prohibited thrown from a height, remove from down operation in sequence. Use process pay attention to safety, it is forbidden to play on the shelf, put an end to accidents. Finally a simple summary, work is important, safety, life is more important, please be sure to keep in mind the above content. Then everyone devoted youth to architecture, and don't overwork, can eat eat can drink drink, old can't do anything, they say, can eat is a blessing, you eat more! It is also a small make up mind. Zhuhai high aluminium alloy folding scaffold
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...