Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

【 Construction steel pipe scaffold 】 Keep living security is the key! Scaffold for construction steel pipe socket type plate being steel pipe support a socket type button scaffold - being Jiangsu S

by:Shizhan     2020-09-29
【 Construction steel pipe scaffold http://www. atjsj。 com/products- 细节。 asp吗? cpid = 14】 Safety is always the problem of building construction, several scaffolding collapse accident happens every year. How to improve the safety of scaffold, to ensure the safety of the scaffold construction, the following few opinions about this problem: 1, the build-up of high-level scaffolding, various materials are adopted by the need to comply with quality requirements. Set-up before 2, high-level scaffolding need strong foundation and the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures. 3, scaffolding, technical requirements should comply with the regulations of relevant specification. 4, need to attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement. 5, horizontal closed: we should step up, step every step or two, be put with scaffolding plank hand or foot basketry, scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board. And in every four step laid between stud and metope system bottom has long security. 6, vertical closed: from step to step 5, each step must be in the outside vertical rod side set 1. 00 m high protective railings and pedal or set up network, protective pole ( Network) With the stud pin down; Step 5 above in addition to the set a guard rail, set net should be all set its safety or security; In concentration areas or residents along the street, it should step up, outside all are safety basketry set net or security. 7, scaffolding, should be higher than the top of the building or operating level 1. More than 5 m, and added a palisade. 8, the erection of scaffolding steel, fasteners, scaffolding and connections shall not be arbitrarily dismantled. When necessary, in the construction needs, with the approval of the site, head, and take effective measures to process is completed, immediately recover.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...