Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Crossover operation - safety requirements Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan safety technology

by:Shizhan     2020-09-04
Each type of work such as the molding, painting, wall of build by laying bricks or stones, when upper and lower grade separation, operating on the same vertical direction is not allowed. Lower operating position, must be in May fall under the upper height range radius. Do not meet the above conditions, the safety protection layer should be set up. Steel formwork and scaffolding demolition, the below may not have other operators. Steel components of the template is dismantled, temporary stacking place should not be less than 1 m from the floor edge, stacking height should not exceed 1 m. Floor and the place such as mouth, opening, scaffolding edge, do not pile up remove the object. Structure construction since the beginning of the second floor, all personnel in and out of the access point ( Including derrick, construction in and out of the lift access point) All should build safety protective casing. High level of more than 24 m crossover operation, should be a double protection. Because above construction may fall within the scope of objects or in the crane arm rotating channel, in the affected range, must be positioned at the top of the gallery can prevent the penetration of double protection.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...