Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Demolition of the viaduct scaffolding principles to be followed when the viaduct scaffold does jiangsu scaffold construction scaffolding - Jiangsu Shizhan

by:Shizhan     2020-09-28
The removal of the viaduct scaffolding need to follow the principle of what? For everybody life safety considerations, the following Suggestions is very important. Here we mainly put forward four proposals. ( 1) Workers need to stand on the temporary set of scaffolding on. ( 2) Demolition work, it is forbidden to use a hammer and other hard hitting, pry. Remove the connecting rod should be in a bag, lock arm should be passed to the ground and into the interior storage. ( 3) Removing connection parts, should first will lock the lock plate, and the lock on the toggle hook of the transferred to the open position, and then began to remove, are not allowed to be hard to pull, it is forbidden to knock. ( 4) Dismantle the door frame, steel pipes and fittings, bundles with mechanical lifting or derrick transmitted to the ground, to prevent the collision, it is forbidden to throw. Responsibility is more important than mount tai, In the use of mobile scaffold, we need to responsible for no one life, we need to have a high sense of responsibility! Viaduct scaffolding dismantling of the principles to be followed is introduced here, temporarily have not understand place, welcome to inquire.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...