Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Dismantle the correct order of aluminum alloy scaffolding - Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizha

by:Shizhan     2020-09-07
Aluminum alloy scaffolding should be used to finalize the design frame type hanging basket frame, hanging basket components should choose steel or other suitable metal structure material, its structure should have sufficient strength and stiffness; Lift hanging basket should be used with control hoist braking device and the overturning device of hoist equipment; Operators must be trained and show certificates. The use of cantilever construction should turn makings platform by the design and calculation. Aluminum alloy scaffolding platform made on scaffolding shall not be attached to the frame body force, must be set independently; Hang suspension wire rope with buildings on either side of the platform Rachel force; Load should be strictly limited platform. All lifting equipment and concrete conveying pump pipe in use with scaffolding to take effective measures of isolation and vibration control to prevent the scaffold by vibration, impact and instability. Dismantle scaffold should formulate and hand over to treat security measures, and shall not even walls demolished, first should be top-down removed one by one in sequence, dismantle scaffold site alert zone should be set up.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...