Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Exterior wall clarificaiton - bamboo scaffolding, engineering safety Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shi

by:Shizhan     2020-08-27
Disclosure: abstract: 1, the bamboo scaffolding, from a security point of view should be phased out, if use the bamboo scaffolding should be special calculation. 2, more than 20 m bamboo scaffold erection height, material must be in strict accordance with the national 'construction and installation workers safety technology operating rules' requirement. 3, the erection height below 20 m bamboo scaffolding, select material must be strictly in accordance with the provisions of the local standard of fujian province. 4, erection of laying hands and feet, stand must be buried in the roots of more than 300 mm. Because of the ground hard layer can't dive, tie in from ground height 400 mm rod protection level sweeping the floor. 5, the scaffold should be considered at the bottom of drainage measures, prevent water step after scaffolding layer of uneven settlement. 6, all masonry or decorate a scaffold must adopt top bracing protection. 7, building scaffolding, its main bar connection, wide field that should be adopted, Or 18 wire) Tie, once every three months to check maintenance. Xiaoqing mie ( This field) Can only be used for the connection of the main bar. 8, the overall solid, in order to ensure that the scaffold at the same elevation of putlog crisscross Settings should be according to the total number of poling equivalence, in the same pair, poling of putlog should to straight up and down, should not be distorted. 9, stud, the ledger, the extension of inclined rod, should regard tip effective diameter by more than 1800 mm. Every 300 - 400 letters tied together. Should not be in the jaw three pole tie at the same time. 10, the bamboo scaffolding Rachel, should be strictly in accordance with 10 - 12 wire twin parallel requirement, and the wall connection, and set the head against the wall, form a, a, keep the scaffolding vertical solid. 11, it is forbidden to operators in drunk into the construction site work. 12, every worker to enter the construction site must wear safety helmet. 13, team if need because of the lack of labor to hire new workers, should be reported to the site in advance. 14, new workers approach should be after a three-level safety disclosure, and passed the examination the rear can let its formal mount guard. 15, new workers approach should have four certificate, i. e. , the professional professional, id CARDS, temporary residence permits family planning certificate and the migrant population. Accept clarificaiton signature:
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...