Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Fastener scaffold dismantle safety technical clarificaiton - Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizh

by:Shizhan     2020-09-02
The preparing work before dismantling scaffolding shall meet the following requirements: ( 1) Comprehensive review of scaffold fasteners connection, even the wall pieces, whether conform to the requirements of the construction such as supporting system; ( 2) According to test results complement dismantling sequence and measures in perfecting the construction organization design, by the competent department approval to implementation; ( 3) Should be dismantled by unit, head of the engineering safety technical disclosure; ( 4) Scaffolding sundries shall be removed and ground obstacles. Dismantle scaffold, shall meet the following requirements: 1) Demolition work should be carried out step by step a top-down, it is forbidden to up and down the homework at the same time; ( 2) Even the wall must be demolished along with step by step a scaffold, forbidden to connect a whole wall layer or layers of demolition and then dismantle scaffold; Segmented demolition of elevation difference should not be more than two steps, such as the elevation difference is more than two years old, 3) When the scaffolding to lower down the last long the height of the vertical rod ( About 6. 5米) Set-up temporary cast, should be in place after the reinforcement, and demolition of the wall; ( 4) When the scaffolding to staging, discrete surface removal, for not dismantle scaffold at both ends, should according to JGJ 130 - first 6, 2001. 4. Article 2 (4), 6. 6. (1) of article 3, paragraph 2 of the set even reinforce wall and lateral brace. When discharging shall meet the following requirements: ( 1) All the components are strictly prohibited thrown to the ground; ( 2) To the components of the ground should be according to JGJ 130 - 2001. 8. 1. 2 ~ 8. 1. Article 5 the provisions of the inspection, repair and maintenance in time, and according to the varieties, specifications and code heap to store at any time. Supplementary work instruction content:
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...