Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Fastener type steel pipe scaffold, layer upon layer handed $fastener type steel pipe scaffold $on aluminum alloy ladder scaffolding - $viaduct Jiangsu Shizh

by:Shizhan     2020-09-29
This information by jiangsu Shizhan scaffolding engineering co. , LTD. To provide you with. If you are looking for products & quot; The fastener type steel pipe scaffold & quot; Related technical requirements, please directly contact with jiangsu Shizhan scaffolding engineering co. , LTD. Or leave a message to them on this site, we offer you & quot; The fastener type steel pipe scaffold at http://www. atjsj。 com/products- 细节。 asp吗? cpid = 30” The detailed information. Fastener type steel pipe scaffold construction need to strictly abide by the erection of the order, and the erection of set-up even wall rod outer shelf at the same time, firm and structure frame column. Stud to vertical, from the beginning of the first layer poling stagger pile bottom. Keep upright longitudinal control verticality control in h plane (1/200 The shelf height) Within, that is, no more than 5 mm. Between all poling docking fastener forbidden omissions, needs to be installed in accordance with the requirements, set along the frame pillar inside dense mesh went with closure. Shelf ceiling: the operational layer frame with a flat screen, rack end, deaden 180 mm high 50 mm thick wooden feet. Within all materials needed by the floor into the frame, it is forbidden to people, feeding off the shelf. Fastener type steel pipe scaffold longitudinal rod extension requires a docking fastener connection, the adjacent two longitudinal rod joint should be staggered not less than 500 mm, within the same step inside and outside two longitudinal rod joint should be staggered, not in the same span. The laid of the operational layer scaffold board should be spread, spread steadily. Scaffold board and docking, laid a joint two lateral horizontal pole, lap laid the scaffold board need in the transverse joint on the horizontal bar. There is no probe plate, length of overhanging scaffolding shall not be more than 150 mm. Below the panel shall establish a flat screen. Used as a scaffold to use a function, in the construction phase protection. Rack in vitro poling inside full closure was close eyes. The construction load is not more than 2 kn/m2. If you have any questions on the fastener type steel pipe scaffold in the case, please don't bid more consultation, our customer service staff will be warm, with all the questions for you!
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...