Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Floor - scaffolding safety operation procedures Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan

by:Shizhan     2020-09-02
1, scaffolding, staff must be after according to the current national standard 'special operations personnel safety technical inspection management rules' ( GB5036) The inspection qualified scaffolder. Mount guard personnel regular physical examination, eligible may show certificates. 2, erection of scaffolding workers must wear safety helmet, wear your seat belt, wearing non-slip shoes. 3, scaffolding set-up quality, components quality and inspection shall be in accordance with the provisions, acceptance, qualified rear must use. 4, layer on the construction load should comply with the design requirements, shall not be overloaded. Shall not be template bracket, cable wind rope, pumping concrete and mortar conveying pipe fixed on the scaffold; It is forbidden to hang lifting equipment. More than 5, when there is a level 6 and level 6 wind and fog, rain and snow weather should stop when the scaffolding, and demolition work. Rain, snowy on assignments due and anti-sliding measures, and shall remove snow. 6, scaffolding safety inspection and maintenance should be performed in accordance with the provisions of safety net should be according to the relevant provisions of the build-up or dismantled. 7, during the use of scaffolding, forbidden to dismantle the following link: ( 1) The master node level pole in the longitudinal and lateral direction, longitudinal and transverse rod sweeps the floor; ( 2) Even the wall. 8, may not be on the basis of the scaffold and adjacent mining operations, or security measures should be taken, and the competent department for approval. 9, while the erection of scaffolding, the lateral due and hurtful protective measures to prevent falling objects. 10, electricity, gas welding work on the scaffold, there must be a fire protection measures and personnel guards. 11, scaffold for site erection of temporary electricity lines and grounding, lightning protection measures, etc. , should be according to the current industry standard 'technical specification for construction site temporary electricity safety ( JGJ46- 88). The relevant provisions. 12, scaffolding, the ground should be set fencing and warning signs, and hold people to keep and prohibit the operation personnel to enter.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...