Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Great oaks grow from little acorns, the moving speed of by scaffolding pieces played mobile speed of scaffolding in pieces pieces efficient mobile scaffold - jiangsu scaffolding manufacturer

by:Shizhan     2020-09-28
Movement speed by scaffolding use points has the following several aspects: ( 1) Connection pin hole is generally hook head bolt diameter slightly larger, so that when installing shelves in place. After the bolt inserted pin hole should be the hook head bolt tight inside the wall, so that the hook head bolt and pin hole and the wall between taut, not to loose. Should nut before dismantling scaffolding to loosen its demolition. ( 2) Frame assembly, should according to the actual location hook head bolt placed. Due to the large template bolt hole position will not change, which can ensure that when a layer hook head bolt position is consistent with the shelves connection pin hole. ( 3) When the whole floor plan implement piecewise line production, segmented in May in the up and down two floors, so the shelf end should be set at the end closed to ensure the construction safety of operating personnel. ( 4) Due to the moving speed by scaffolding at http://www. atjsj。 com/products- 细节。 asp吗? Cpid = 38 supports in new water concrete external wall, should guarantee the enough strength and external wall concrete. The strength calculation of concrete can be in accordance with the construction of the average daily temperature curve is calculated according to the strength of concrete age. Its value should reach more than 7 mpa.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...