Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

How to use aluminum alloy truss structures, good stage? - - - - - - Jiangsu city Shizhan Truss co. , LTD

by:Shizhan     2020-06-29
An aluminum alloy truss structures, probably can be divided into twelve program, the detailed process is as follows: one, the first general orientation set the four base on the ground, organise the following support legs, make it in a horizontal plane. Second, on the four corners of the outer edge of the base into the part under the oblique support, each Angle 2 root, a total of eight root. Third, put the head screwed on the base, pay attention to the direction of rotation of the head and shown in figure. Four, set a good party set in the head. Fifth, connects the beam on the ground. Six, the ends of beams are parting and two ends of two sets of good docking link, cross members are assembled on the ground to complete at this time. Seven, connect pillar lie truss flat is good, and then put in the end on the head and the other end of the screw on the cross arm, the hanging hoist and cross arm link together, the role of the hoist is used for the following progress bar truss. Themselves more than eight, the pillar with truss stand up gradually, pay attention to do not force too big pushing columns to, and then fixed on the surface of the head screw. After nine, pillar erected, the hanging hoist hook through condole belt hook stay below the crossbar. Ten, four-self gradually drag hang together hoist pull bar a person's head at the mercy of bearing. Eleven, above the beam installed lighting audio equipment. Twelve, four selfs a drag hang together hoist to scheduled height.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...