Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Indoor decoration scaffold - acceptance requirements Common problems - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan

by:Shizhan     2020-08-28
Scaffold for indoor decoration acceptance requirements are as follows: scaffold should check whether horizontal rod fastening. Framework of scaffolding, the distance between the vertical rod and bar size should be the same. Should comply with the requirements. Scaffolding installation and assembly, including the selection of tool holder and key points should comply with the requirements. Connection point or fixed part of the structure of wall should be safe and reliable; Scissors support, brace should comply with the requirements. Scaffolding safety protection should be effective. Safety devices must be effective; Fasteners and fastening degree should comply with the provisions of the fasteners. Scaffolding, pedals, derrick crane should be safe and reliable. The scaffold shall be placed in accordance with the relevant provisions. Interior decoration is generally use scaffolding caster wheel, so easy to move the brush paint the walls and ceiling, but castor must have a brake device, to prevent slipping. Indoor decoration scaffold in the construction of the wall and ceiling decoration is refers to the erection of scaffolding. Interior decoration decorate quota of scaffold has been put into the corresponding project, do not need to be listed project fee. The following conditions: (but need to separate calculation 1) If indoor height above the roof panel and needs at the bottom of the roof plaster, can increase the internal decoration of scaffolding. But interior decorate no longer calculate scaffolding, simple to deduct the cost of the scaffolding was in plaster fixed; If a day considering interior wall plaster and plaster, even more than height, also can no longer consider interior scaffold, interior wall inside the area to calculate vertical projection of the scaffold. ( 2) When the wall, the height of the bottom of the column, beam, plate seam, brush, or spray, alone does not consider the cost of additional facilities per square meter, regardless of the interior decoration of scaffolding. ( 3) Pick out the balcony, hallway, doors, awning facade decoration, such as it outstand the wall above 80 cm, can press former long extension step gauge calculation cost of scaffolding. Indoor decoration scaffolding engineering calculation, shall be calculated on the roof projection area of square meters. Room height but not greater than, can be directly used indoor decoration scaffolding fixed forehead. If indoor height more than, then calculate each additional high level. Scaffold characteristics are as follows: ( 1) Scaffolding easy to use, can choose according to the needs of using single-layer, multi-layer, monomer, conjoined, castor can be installed in parallel and mobile; ( 2) Disassembly and assembly is simple, without technology, as long as the ordinary workers can complete; ( 3) Scaffolding is easy to store, need not when can pile up. ( 4) Scaffold use galvanized processing, greatly improving the service life of the scaffold. As the saying goes, to from beginning to end all do work, nature should follow this principle, when use can't do anything, after the demolition of interior scaffold also need 【 Indoor decoration scaffolding 】 Demolition of the order and request: to dismantle, should it is forbidden to demolition. All connectors should use scaffolding to remove one by one. Dismantle scaffold before it is forbidden to dismantle all the connections of wall layer, or layer. Segmented dismantling height should not exceed two steps. Dismantling shall be carried out from top to bottom, it is forbidden to work up and down at the same time. When the scaffolding on the bottom long after demolition to the height of the stud, should be set in the appropriate position in the temporary support steel after dismantling connection wall. Dismantling shall be carried out from top to bottom, it is forbidden to work up and down at the same time. Scaffolding demolition material should, in turn, put down, it is forbidden to throw to the ground. All demolition of steel pipe and fasteners should be unified arrangement, and discard them.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...