Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

【 Indoor decoration scaffolding 】 Results acceptance also need to 'play by the rules'! - Industry dynamic - - aluminum alloy scaffolding manufacturer Focused on the work high above the flat

by:Shizhan     2020-09-07
【 Indoor decoration scaffolding 】 Results acceptance also need to 'play by the rules'! Indoor decoration scaffolding acceptance requirements are as follows: first, first of all, aluminum alloy scaffolding check whether horizontal rod fastening, pedal is stable. Second, the shelves of the layout, the layout of vertical rod and bar spacing should comply with the requirements. Three, three, the installation and assembly of the shelves, including from the tool carrier choice and emphasis should comply with the requirements. Part four, the fourth, even with a fixed point or wall, used in a safe and reliable structure; Scissors, braces should comply with the requirements. Five, the safe protection of scaffolding, ping an assembly is invalid; Fasteners and tie tighten degree should comply with the regulations. Six, scaffolding, hoisting equipment, wire rope, derrick installation should be safe and reliable, the laying of scaffold should comply with the rules. Seven, interior decoration, usually adopt scaffolding caster, to facilitate the action of brush paint the walls and ceiling, but the caster must be equipped with brakes, to prevent the slide. Interior decoration erected scaffolding scaffolding refers to the time of wall and ceiling decoration interior decoration construction scaffolding has been listed in the corresponding decorate project quota, don't need to charging items listed separately. However, the following additional calculation: the main results were as follows: ( 1) If indoor height greater than 3. 6 m, the need for surface rendering, can increase indoor decoration & quot; Scaffolding & quot; 。 But no longer calculate scaffolding, interior decorated in plaster quota is not deducted from the simple scaffold cost; If only wall plaster and plaster condole top, even if more than 3. 6 meters, and not included in the decoration inside the scaffold, only wall vertical projection area of the calculation for the scaffold. ( 2) Height in 3. 6 m above the surface of wall, column, beam and plate bottom of jointing, brush or spray project alone, facility fee 8 per 100 m2. 00 yuan, shall not take indoor decorate the scaffold. ( 3) , balcony, hallway, doors, awning facade is decorated, if it outstand the wall 80 cm or more, according to the length of the positive factor, meter jump cost of scaffolding. When calculating the interior decoration engineering scaffold, condole carries on the projection area must be calculated according to square meters. Fang indoor height more than 3. 6 m but not more than 5. 2 m, can be directly applied & quot; 5 indoor decorate the scaffold. Less than 2 m & quot; Fixed child day. If indoor height more than 5. 2 m, more than 1 per. 2 m increase a super-tall calculation. Indoor decoration scaffold characteristics: 1 scaffolding easy to use, can choose according to the need of using single layer and multilayer, monomer, conjoined, and can be installed castor parallel moving; 2 tear open outfit simple, do not need technology, as long as the ordinary workers can complete; 3 easy to store, need not when can stack storage; Use galvanized scaffolding process, greatly increase its service life; As the saying goes, work is necessary. When it is used, are naturally follow this principle, according to work flow. After completion of scaffolding in interior decoration, will also be necessary to remove the job. Scaffold interior decoration to dismantle order and requirements: demolition shall be carried out from top to bottom. It is forbidden to top-down operation at the same time. All connectors should use scaffolding to remove one by one. In front of the scaffold is forbidden to dismantle the whole layer or layers of wall fittings. Should be not more than two levels of section removed. Demolition shall be carried out from top to bottom. It is forbidden to top-down operation at the same time. Has long pole when the height of the scaffold to dismantle, should replace the temporary support the installation of the reinforcement, then remove the wall. Demolition shall be carried out from top to bottom. It is forbidden to top-down operation at the same time. Derive interior decoration scaffold materials, when finished should, in turn, passed down, the dumped into the ground. All demolition of steel pipe and fasteners should be unified, do not arbitrarily discarded.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...