Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Insert button scaffolding manufacturer production in hebei cangzhou Ren Qiu - Aerial work which can be divided into - Industry dynamic - - aluminum alloy scaffolding manufacturer focus

by:Shizhan     2020-09-07
Aerial work which can be divided into the contact phone number: 18420150310 insert button scaffolding is a kind of shelves racks, fast and safe and efficient support latest template the wood with early down the quick release function, such as time saving province work material. Insert button scaffolding manufacturer production 3600 yuan per ton, specializing in the production of plug button scaffolding poling bar rod, round buckle scaffold poling bar bar, quick release quick scaffolding poling bar rod, socket panel button scaffolding poling bar rod, self-locking scaffold poling bar pull rod, and holds the palm top holds the top oil filar silk bar and so on, annual output 70000 tons, 200 tons, the factory covers an area of 60000 square meters. A, stud design load: 1. 1. Rail step distance of 0. 6 meters, each stud design load for 40 kn. 2. 2. Bar interval of 1. 2 meters, each stud design load is 30 kn. 3. 3. Bar interval of 1. 8 meters, each stud design load of 25 kn. 4. 4. Bar interval of 2. 4 meters, each stud design load for 20 kn. Second, rail design load: 1, 0. 9 m rail, across the concentrated load is 6. 77KN; Uniform 14 total load. 8 kn2, 1。 2 meters rail, across the concentrated load is 5. 08年kn; Uniform 11 total load. 11 kn3, 1。 5 meters rail, across the concentrated load is 4. 06KN; Uniform 8 total load. 89 kn4, 1。 8 m bar, across the concentrated load is 3. 39KN; Uniformly distributed load at 7. 40 kn 15 kn four, three, P = support design load: 1, the supporting height H 5 meters or less, the design load is 180 kn2, sustains a 3, 5 meters height of 10 meters insert button scaffolding poling bar rod inspection report issued by national construction engineering quality supervision and inspection center on the basis of GB24911 - 2013, absolutely true, high welding strength, no crack, good paint, wall thickness. 3. 0 - 3. 5 mm, solid, labor saving, shorten the construction period, reduce cost, builders is the best choice of the leasing business, real estate developers, construction site in China railway construction in water conservancy is special, the work high above the level can be divided into which a few
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...