Install button scaffolding construction points - The company dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizha

by:Shizhan     2020-09-07
Install button scaffolding construction key points: 1, early should be special I plan design, supporting system and the total package units pay-off positioning, make the horizontal flat vertical support system, to ensure that the late bracing and whole set of connecting rod, and ensure the overall stability and resistance to capsizing. 2, button scaffold installation base must be ramming formation and hardening of concrete measures. 3, button scaffold with - should be used Elevation of beam bottom elevation range, the height and large span of a single component bearing rack to pull bar and axial pressure (stud Critical force) Check to ensure the stability of the frame body, and security. 4, the frame body build-up to adding enough bracing, after the completion of the jacking and frame rail - 300 The distance between 500 mm to add enough horizontal tie, make its overall stability get reliable guarantee; 5, at present our country construction ministry no button scaffold industry standards and norms, but the construction has begun to widely used on the ground, I certainly hope that relevant departments to formulate the corresponding specification door, make the tray button scaffolding used correctly in the project have reliable basis.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...