Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Jiangsu construction steel pipe scaffold - Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan security division

by:Shizhan     2020-09-04
Shenzhen construction steel pipe scaffold main advantage is hardness, strength and toughness is higher. The main has the following advantages: 1. Hardening layer martensite structure is fine. Ability to resist fatigue breaking workpiece is higher. 2. Profiles have great compression stresses in the workpiece surface after quenching. Workpiece deformation is small. 3. Do not need to whole heating. Power consumption is small, rotating fastener pollution-free. Workpiece profile oxidation decarburization is lighter. 4. Heating speed. Easy to realize mechanization and automation. 5. Shenzhen heating equipment can device in mechanical processing production line. Convenient for management, and can reduce the transport, saving manpower, improve the production efficiency, easy to control. Shenzhen construction steel pipe scaffold safety is always the problem of building construction, several scaffolding collapse accident happens every year. How to improve the safety of scaffold, to ensure the safety of the scaffold construction, the following few opinions about this problem: 1, the build-up of high-level scaffolding, various materials are adopted by the need to comply with quality requirements. Set-up before 2, high-level scaffolding need strong foundation and the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures. 3, shenzhen scaffolding, technical requirements should comply with the regulations of relevant specification. 4, need to attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement. 5, horizontal closed: we should step up, step every step or two, be put with scaffolding plank hand or foot basketry, scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board. And in every four step laid between stud and metope system bottom has long security. 6, vertical closed: from step to step 5, each step all needs to set high in the outside vertical rod side protective railings and foot or set up a network, protective pole ( Network) With the stud pin down; Step 5 above in addition to the set a guard rail, set net should be all set its safety or security; In concentration areas or residents along the street, it should step up, outside all are safety basketry or shenzhen safety set net. 7, scaffolding, should be higher than the top of the building or operating surface above, and added a palisade. 8, shenzhen of scaffold erection of steel pipes, fasteners, scaffolding and connections shall not be arbitrarily dismantled. When necessary, in the construction needs, with the approval of the site, head, and take effective measures to process is completed, immediately recover.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...