Jiangsu metal fastener type double row - steel pipe scaffold attention problem Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu s

by:Shizhan     2020-09-04
1) Shenzhen metal fastener type double row steel pipe scaffolding demolition field must be set up warning region, hanging eye-catching warning signs. Prohibit the operation personnel through the alert area or continue over the scaffold construction organization. The ground supervisor must fulfill its responsibilities. High-rise building scaffold should be removed and good communications equipment. 2) Carefully check whether including rigging, lifting machinery safety and reliability. 3) In case of strong wind, rain, snow and other special climate, stop for the removal of scaffolding. Implementation implementation of dismantling homework at night, you'll have good lighting. 4) All high homework personnel, should be strictly in accordance with high operation regulations and to observe the safety discipline, remove the process requirement. 5) Building facade lock all the Windows must be closed in a cool, don't allow to open or to the overhanging objects. 6) After dismantling personnel into the post, first check to reinforce the double row steel pipe scaffold loose parts, clean up floor guest materials, and garbage. All cleaning materials shall be safe transport to the ground. 7) High according to the program into the demolition, the safety net of a vertical block has a mat spread its protective railings a joist a diagonal member wall rod in a row a large bar a small bar, rod. 8) Metal fastener type do not allow the discrete surface to dismantle or upper and lower second removed at the same time, Step type) 。 Seriously do it step by step, one rod. 9) All the wall rod, diagonal member, row insulation measures, step up measures must with scaffolding layer removed a simultaneous decline. 10) All bar and fasteners, should be separated when demolition, do not allow the pole pieces of the attached fastener conveying the ground, or two at the same time remove the ground. 11) All scaffolding demolished, should be erected in the outgoing, carry, prevent from inside out, after the hand foot board face garbage objects directly from the high fall injury. 12) Scaffolding used shall be in strict accordance with the national special type welding gas cutting process must be in the requirements and regulations. Increased emissions of full-time personnel, equipped with hopper ( Barrels a day). To prevent Mars and cutting splash down, it is forbidden to unlicensed use of cutting tools. 13) After the completion of the day, we should carefully check posts around the situation, such as finding hidden place, should be timely repair or continue to perform until the end of a program, a position, can leave post. 14) Metal fastener type double row steel pipe scaffold to all the rods, fasteners and other objects on the ground, should according to the type of pile up.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...