Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

【 Jiangsu scaffold by disassembling factory 】 Painted permitted error requirement can't be too arrogant, scaffold by manufacturer, in jiangsu, jiangsu scaffolding leasing, bowl type steel pipe scaffold - Jiangsu Shizhan hand foot

by:Shizhan     2020-09-30
Jiangsu scaffold by manufacturer, http://www. atjsj。 com/products- 细节。 asp吗? Cpid = 41 can allow deviation requirements, according to the provisions of the above calibration interval, the vertical distance, horizontal distance and verticality of stud. 1) Basic technical requirements: the engineering scaffold part landed on the roof in the basement and the backfill soil outside, after winning acceptance will be carried out on the roof and foundation bearing capacity. 2) Poling verticality allows horizontal deviation of 25 mm. 3) Spacing: step distance & plusmn; 20 mm, longitudinal pitch & plusmn; 50 mm, subtense & plusmn; 20mm。 4) The ends of the height of longitudinal rod, a rod & plusmn; 20 mm, inside with cross two longitudinal bar elevation difference & plusmn; 10mm。 5) The master node each fastener center distance each other & le; 150mm。 6) Synchronous stud on two apart docking fastener elevation difference & ge; 500mm。 7) Stud on the docking fastener to the master node distance & le; A third? h; Jiangsu Shizhan scaffolding consistently strives for the survival by the quality, credibility and development services to clients. In order to meet the needs of social development, we adhering to the scientific management methods of modern enterprise, continuous innovation, technical excellence, the department brings together a group of forge ahead represents the level of technical elite, bigger and stronger is our goal to struggle!
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...