Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Jiangsu scaffold by manufacturer to low down the how to set up perfect! Scaffold by open factory in jiangsu, jiangsu scaffolding rental prices, jiangsu mobile scaffolding rental - Jiangsu Shi

by:Shizhan     2020-09-28
1. Scaffolding, adopted by the various materials must conform to quality requirements. 2. Plate, the base shall be positioned accurately on the line, plate need to lay out smoothly, shall not be suspended. 3. Based need strong high-level scaffolding, before the erection of the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures. 4. Different erection of columns, diameter of steel pipe it is forbidden to mix, docking fastener adjacent columns shall not be in the same height, stagger distance should conform to the requirements of the structure. 5. Scaffolding, technical requirements should comply with the regulations of relevant specification. 6. Started the erection column, should every 6 set across a brace, until a stable after installation, the wall shall be removed depending on the situation. 7. Need to attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement. 8. When take to have even the wall is a structural layer, the erection of the columns, finished here after longitudinal rod, lateral horizontal pole, should immediately set even a wall. 9. Level is closed: we should step up, step every step or two, be put with scaffolding plank hand or foot basketry, scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board. And in every four step laid between stud and metope system bottom has long security. Pay more attention to information please see our: jiangsu scaffolding manufacturer, http://www. atjsj。 com/products- 细节。 asp吗? cpid = 41
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...