Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

【 Jiangsu scaffolding leasing 】 'The danger past and god forgotten' demolition of youdao! Jiangsu scaffolding leasing to cardiac jiangsu mobile scaffolding leasing to cardiac gantry scaffolding customization

by:Shizhan     2020-09-28
Don't know, a look startled, looked at these, you still dare careless when using the scaffold? Now look at the Jiangsu scaffolding leasing http://www. atjsj。 com/products- 细节。 asp吗? cpid = 33】 Share the scaffolding demolition notice: 1. Changshu scaffolding outrigger dismantled before assembling, head of the project by the unit concerned personnel to conduct a comprehensive inspection of shelf project with visa acknowledge, building construction, and don't need to use, scaffolding shall be dismantled. 2. Changshu scaffolding dismantling scaffolding shall set up alerts, hanging eye-catching warning signs, prohibit the operation personnel and construction personnel on the ground can do, and has the specialist is responsible for the alert. 3. Long standing pole, the removal of diagonal should be conducted by two people cooperate, should not be separate operation, should check whether the work is firm, changshu scaffolding requirements should be added a temporary fixed support when necessary, to prevent the accident. 4. Changshu scaffolding demolition of an outer layer should be before opening on the remaining materials to remove debris, according to the top-down split after loading first, after the first open order. 5. Changshu scaffolding demolition order: Ann & rarr; Kicking rod & rarr; Protective railings & rarr; Bracing & rarr; Foot hand piece & rarr; Joist rod & rarr; Even the wall bar & rarr; The ledger & rarr; Small bar & rarr; Poling, top-down dismantle, step by step, not step type is adopted, the homework is not allowed, the same below. 6. In case of strong wind, rain, snow, such as climate, changshu scaffolding requirements outside the frame cannot be removed. 7. Changshu scaffolding, remove the steel pipe and fasteners should be classification piled up, it is forbidden to high-altitude throwing. 8. Condole of steel pipe with fastener to the ground should be timely according to the specifications stacked neatly.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...