Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

【 Jiangsu scaffolding 】 Not careless - safety, moment Jiangsu Shizhan scaffolding engineering co. , LTD

by:Shizhan     2020-09-29
Even the scaffolding on common sense has been said, but there is something that we need to be, such as we speak today jiangsu scaffolding when building high-level, pay attention to what problem. Although also talked about before, but for security issues is very necessary to talk about. Build a high-level scaffolding, you need to follow certain requirements, the following is a detailed introduction: ( 1) Adopted by the build-up of high-level scaffolding, various materials must conform to quality requirements. ( 2) Based need strong high-level scaffolding, before the erection of the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures. ( 3) Scaffolding, technical requirements should comply with the regulations of relevant specification. ( 4) Need to attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement. ( 5) Level is closed: we should step up, every step or two step, spread the scaffold hand or foot basketry, scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board. And in every four step laid between stud and metope system bottom has long security. ( 6) Vertical closed: from step to step 5, each step must be in the outside vertical rod side set 1. 00 m high protective railings and pedal or set up network, protective pole ( Network) With the stud pin down; Step 5 above in addition to the set a guard rail, set net should be all set its safety or security; In concentration areas or residents along the street, it should step up, outside all are safety basketry set net or security. ( 7) Scaffolding shall be higher than the top of the building or operating level 1. More than 5 m, and added a palisade. ( 8) Of scaffold erection of steel pipes, fasteners, scaffolding and connections shall not be arbitrarily dismantled. When necessary, in the construction needs, with the approval of the site, head, and take effective measures to process is completed, immediately recover. Keywords: jiangsu scaffold
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...