Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Jiangsu south lake scaffolding roofing waterproof coating construction construction matters needing attention in operation Industry dynamic - - aluminum alloy scaffolding manufacturer Focus on flying for

by:Shizhan     2020-09-04
Shenzhen south lake scaffolding telephone: 18420150310 alpine for roof decoration, the most important thing is to do roofing waterproof coating, can only be for the next ready roofing waterproof construction, doing so so, if this procedure will cause serious influence to later life, small make up in here for everybody introduction of roofing waterproof coating, hope to be of service. Roofing waterproof coating practice steps are: base leveling to clean up the base level, wet base to besmear to brush the first waterproof coating, coating of the second - quality acceptance - layer construction waterproof coating. Operation: 1. Should be taken before construction waterproof coating on the surface of the dry basis moisture base to no MingShui shall prevail, if the base level damp but no MingShui construction directly. 2. According to the ratio of the emulsion of water proofing coating first in mixing materials barrels, then powder material, fully mixing evenly, no grain of paste and let stand for 10 minutes and then a stir, the effect is much better. 3. Will directly with brush or roller mucilage coating on the base, after the first layer completely dry ( About 2 hours or hand wipe non-stick shall prevail) , besmear again the second time, two times of brushing direction should be staggered. 4. In the process of operation should be intermittent mixing in order to prevent the mucilage precipitation. 5. Solid membrane completely dry before doing the above mortar layer or other layers. Construction attention: 1. Prohibited under 5 ℃ or construction under the condition of rain. 2. If construction in particularly humid environment and ventilation, ventilation equipment should be adopted to speed up the waterproof coating film, so as not to affect the quality of the waterproof layer; 3. Avoid by all means will have hard sand mucilage reoccupy after add water mixture; 4. Node processing in accordance with relevant regulations, suggest to add a layer of glass fibres; 5. Paste within 24 hours after coating, it is necessary to prevent people from walking and can't wear high heels or allowed to enter the waterproof layer. 6. Completed the waterproof layer before didn't cover, can not have iron, steel nails, steel bar, scaffolding and other edges weight or pile on the waterproof layer construction, so as not to damage the waterproof layer; 7. Waterproof layer completely dry solid before doing other coating; 8. Completes the protective measures, such as wear gloves of roofing waterproof coating is to introduce the relevant information to here, hope to be of help in this article. If you still have what not understand place can give below small make up the message oh, we will answer for you as soon as possible. Shenzhen south lake scaffolding
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...