Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Juchen stage equipment company-how to build aluminum

by:Shizhan     2020-05-29
Aluminum alloy truss is also called truss, truss frame. Generally, it is a combination of 6061-T6 aluminum material after cutting, processing, welding, polishing, painting and other treatments. It is widely used in performance exhibitions, event celebrations, background layout, lighting and sound hanging systems. It can be built into various large, medium and small truss systems according to the site, and can be flexibly combined according to specific requirements. Lightweight, easy to build and transport, the maximum span can reach more than 30 meters, aluminum is extremely resistant to compression and corrosion resistance. According to the shape, it can be divided into square (corner) frame, triangle frame and special-shaped frame. According to the installation category, it can be divided into bolt truss and screw truss. 1. First place the four bases at a rough position on the ground and adjust the lower legs so that they are on a horizontal plane; 2. Insert the bottom part of the diagonal support on the outside of the base on the four corners, insert 2 on each corner, a total of 8; 3. Fix the reverse head on the base with screws, and pay attention to the direction of rotation of the reverse head as shown in the figure; 4. Put a square set on the reverse head; 5. Connect the beam on the ground; 6. Connect the two ends of the beam to the two square sleeves on both sides, and then the beam is assembled on the ground; 7. Lay the column truss flat and connect it, and then screw one end to the opposite head, and the other end to the crossarm, and at the same time link the hanging hoist and the crossarm, the role of the hoist is to lift the lower beam truss ; 8. Multiple people slowly erect the column truss together, taking care not to push the column with too much force, and then fix the screws on the reverse head; 9. After the upright is erected, hook the hook below the hoist to the lower beam through the sling; 10. 4 people slowly pull the hoist together to pull the beam to the left and right of the person's head; 11. Install lighting and sound equipment on the beam; 12. 4 people together pull the hoist to the predetermined height to stop; 13. Tighten one end of the diagonal support and the column, and the other end to the horizontal support of the base, so that the aluminum alloy frame is completed.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...