Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Look for the' Gantry scaffolding custom 】 , will be comfortable home! Painted doors scaffold custom painted moving speed by scaffolding - jiangsu scaffolding manufacturer

by:Shizhan     2020-09-28
【 Gantry scaffolding custom http://www. atjsj。 com/products- 细节。 asp吗? cpid = 37】 Doors scaffold accessories demolition: when we are in the construction, should be checked by unit, head of the engineering validation, if no longer in need of scaffold, to dismantle scaffold, according to the removal of scaffolding customized solutions, after the project manager's approval, to be able to dismantle, when the door to dismantle scaffold fittings should meet the following requirements: 1, the first in the dismantled scaffold should try to get rid of the scaffold materials, tools and spare sundry etc, clean up after, should be set up warning zone, set up warning signs, to alert by specialized personnel. 2, gantry scaffolding accessories demolition work should be done according to the principle of first open: ( 1) Across the edge of the part, to the top of the armrest and the removal of baluster, then dismantle planks and escalators, tear down after horizontal rod reinforcing rod and bracing. ( 2) Starting from the top of cross-border, cross braces, and remove the top bracing wall rod and the top of the door frame. ( 3) And then step down to dismantle the door frame and accessories, to control the free cantilever scaffold height can't more than three steps, otherwise have to be added a temporary Rachel. ( 4) Continue to remove down, on the wall bar, long horizontal pole, and the bracing and so on, need to scaffold disassembly to certain after across the door, can only be removed. ( 5) Remove the rod sweeps the floor, and at the bottom of the door frame and the sealing bar, etc. ( 6) Will base plate and block removed.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...