Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Maintenance of grasping: 【 Move speed after scaffolding 】 To kneel down! Mobile scaffold for speed by does bowl type steel pipe scaffold does construction steel tube scaffold

by:Shizhan     2020-09-29
【 After scaffolding http://www mobile speed. atjsj。 com/products- 细节。 asp吗? cpid = 38】 Used in the process of how to maintain? 1, the designated persons every day Tours of inspection was carried out on the scaffolding, check the stud, plate sinks, loose, frame body all fasteners slide fastener, loose, complete frame to each component is complete. 2, prepare scaffolding foundation drainage, after the rain to the scaffolding frame body basis to conduct a comprehensive inspection, it is strictly prohibited to scaffolding basal water sinks. 3, the operational layer construction load shall not exceed 270 kg/square metre, shall not cross bar support, such as cable wind rope fixed on the scaffolding, pensile clog on scaffolds shall be strictly prohibited. 4, anyone is forbidden to dismantle scaffold on any parts. 5, in case there are more than 6 wind, fog, rain and snow weather should suspend scaffold work, needs to be checked before return to work without problems rear can continue to work.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...