Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Metal fastener type double row steel tube scaffold - Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan

by:Shizhan     2020-08-22
Metal fastener type double row steel pipe scaffold is belong to the steel tube of metal scaffolding, fasteners with single row, double row of the difference between 1) Metal fastener type double row steel pipe scaffolding demolition field must be set up warning region, hanging eye-catching warning signs. Operators are strictly forbidden in the alert area of passage or continue to organize the construction above the scaffolding, ground monitoring personnel must perform their duties. High-rise building scaffolding demolished, should be equipped with good communication device. 2) Carefully check whether the lifting machinery including rigging is safe and reliable, lifting machinery is not allowed to build on the scaffolding, should be another set. 3) In case of strong wind, rain, snow and other special climate, should not be for the removal of scaffolding. The demolition of homework, night should have good lighting. 4) All homework on high metal fastener type double row of steel pipe scaffold personnel, should be strictly in accordance with the provisions of the high homework and to observe the safety discipline, and demolition process requirements. 5) Building lock all the Windows must be closed, not allowed to open or to the overhanging objects. 6) After dismantling personnel into the post, first check to reinforce the loose parts, step remove the materials, items and stay inside the garbage. Steel pipe scaffold clear all content should be safety to the ground, it is strictly prohibited to high toss. 7) According to the erection of the program on that, a vertical block has a mat spread its protective railings a joist a diagonal member for a large bar a small wall rod bar a stud. 8) Do not allow the discrete surface to dismantle or upper and lower two step removed at the same time, Step type) 。 Seriously do it step by step, one rod. 9) All the wall rod, diagonal member, row insulation measures, step up measures must with scaffolding layer removed a simultaneous decline, no first dismantled. 10) All bar and fasteners, should be separated when demolition, do not allow the pole pieces of the attached fastener conveying the ground, or two at the same time remove the ground. 11) All mat spread its demolition, should be erected in the outgoing, carry, prevent from inside out, after the garbage objects directly from its surface, falling cuts. 12) Scaffolding must be used within the welding gas cutting process, metal fastener type double row steel pipe scaffold should strictly in accordance with the requirements of the national special type of work and fire regulations. An additional full-time personnel, equipped with hopper ( Barrels a day). To prevent Mars and cutting splash down, it is forbidden to unlicensed use of cutting tools. 13) After the completion of the day, we should carefully check posts around the situation, such as finding hidden danger, should be repaired in time or to continue to the end of a program, a position may leave post. 14) Metal fastener type double row steel pipe scaffold to all the rods, fasteners and other objects on the ground, should according to the type of pile up.
stage roof truss stand truss is liked by everyone and is used in every household.
For decades, Jiangsu Shizhan Group Co.,Ltd has searched for and found a number of secrets to help customers through out the world to achieve aluminium scaffolding suppliers by providing useful and efficient solutions. Go to Shizhan Truss to learn about some of those secrets.
There are ample scientific evidence of reducing the risk of stage roof truss.
The best way to determine the ideal strategy of stand truss is to continually test and refine your selling and marketing tactics.
To strengthen and grow our leadership position by providing stand truss across a range of market segments, including aluminium scaffolding suppliers, and high-performance servers.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...