Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Mobile scaffold pole spacing requirements - Xinxiang fast loading aluminum alloy scaffolding - Industry dynamic - - aluminum alloy scaffolding manufacturer Focused on the work high above the flat

by:Shizhan     2020-08-23
Xinxiang fast loading aluminum alloy scaffolding contact phone number: 18420150310 mobile scaffolding, degree of longitudinal bar and the vertical rod of each become friends point must be set a degree of horizontal pole and axis of poling interval should not be greater than 150 & # 13212; 。 Degree of horizontal bar in the center of the span should be in accordance with the handle of scaffolding to be resettled. To avoid scaffold outward or inward capsized, the scaffolding must be set to withstand fixed pieces of tension and stress. A fixed form a rigid and flexible two types. The scaffolding of highly under 24 m general rigid fixation should be taken to pieces and throughout building reliable connection. Mobile scaffolding must conform to the requirements of the safety design, fastener type steel tube mobile scaffold pole spacing normally not larger than 2. 0 m, poling horizontal distance not greater than 1. 5 m, and even the wall not less than three across three steps, mobile scaffolding put with a bottom layer of scaffold board and fixed operation layer be put with scaffolding plank, since the operation layer down the plan, every 12 m to spread a layer of scaffolding. Construction fastener type steel tube size shall comply with the mobile scaffolding safety technical specifications '( JGJl30) 1 - 1 and 6. Xinxiang fast loading aluminum alloy scaffolding
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...