Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Moving speed by scaffolding calculation of quantities is also has a unique skill in pieces by efficient mobile scaffolding scaffolding in pieces, moving speed Jiangsu Shizha

by:Shizhan     2020-09-30
The moving speed of by scaffolding points comprehensive mobile speed scaffolding, single moving speed by scaffolding two forms. Who can calculate building area, and by a construction unit general contracting of industrial and civil building engineering, comprehensive mobile speed shall be executed after the scaffold norm; Whoever does not need to build mobile computing with a construction area of speed of scaffold, or can calculate construction area but the construction and decoration engineering respectively by several construction units contracting unit engineering and other engineering projects, executable single moving speed by scaffolding quota. ( A) Pick up scaffolding 1 integrated mobile speed. Comprehensive mobile speed scaffolding of quantities, according to the structure of the total construction area of the m2 is calculated. 2. Integrated moving speed by scaffolding quota in the project refers to a single building layer and a layer of the basement unit engineering, multi-storey buildings refers to the second floor above ( Excluding the basement layer) The unit of engineering. 3. Theatres, auditorium with ceiling, the ceiling height in 4. Needed for more than 5 m, and moving speed of scaffolding, according to the theatres, hall increasing movement speed by scaffolding and quota calculation. 4. Integrated moving speed by scaffolding norm within the project does not include building vertical closed, vertical protective rack and level of protection, protective railing, actual need should be calculated separately. 5. According to the comprehensive mobile scaffolding quota calculation speed, in addition to the above rules can receive increasing movement speed calculation of single scaffolding, pick up scaffolding shall not calculate other mobile speed. ( 2) Pick up scaffolding 1 single mobile speed. Movement speed by scaffolding and buildings outside vertical seal of quantities according to the exterior line length, multiplied by the calculation of the height to m2 of outdoor floor to external, prominent outside wall battlements within 24 cm width, attached chimney scaffolding quantity calculate not spread, such as the mobile speed, more than 24 cm outside when calculated according to the size of graphic, incorporated into the moving speed by scaffolding of quantities. Don't deduct the Windows and doors hole, empty circle of the area. 2. Movement speed by scaffolding of quantities according to the wall in a vertical projection area of computing. 3. Independent column according to the single exclusive mobile scaffolding quota project calculation speed, its outer circumference according to the graphic column structure of quantities plus 3. 60 m by highly in terms of m2. 4. Interior ceiling decoration indoor floor surface from design in 3. More than 60 m, should calculate and moving speed of scaffolding, computing and mobile speed after scaffolding, metope adornment engineering is no longer moving speed by scaffolding calculation. And movement speed by scaffolding quantity calculated on indoor net area to m2, its height in 3. 60 ~ 5. Layer between 20 m, calculation, more than 5. Every increase 1 to 20 m. 20 m calculated on add a layer. Movement speed by scaffolding calculation formula is as follows: a full layer = ( Indoor net height - 5. 20 ( m) ) / 1. 20 ( m) 5. Aerial transportation moving speed by scaffolding quantity calculated on build-up to extend length m. 6. Impending movement speed by scaffolding set-up level according to the projection area of the m2 calculation of quantities. 7. Ramps according to different height of quantities to calculate. 8. Chimney and water tower mobile speed after the scaffold by the tube diameter and height of quantities to calculate. 9. Elevator shaft moving speed by scaffolding of quantities according to the single span to calculate. 10. Level of protection frame of quantities calculated at ceiling level projection area of the m2. 12. Vertical protection quantities according to the outdoor floor is the highest one layer between rail set-up height by the erection of length in terms of m2. 13. Vertical hanging Ann quantities according to the length of the frame net part by highly in terms of m2. 14. Pick out the type, quantity according to pick out the horizontal projection area of the m2 calculation of Ann. 15. Roof protective railings as shown roof eaves with the factor calculation, floor border guard rail as shown in the limb length to the factor is calculated. 16. Staircase guardrails as shown to cast a shadow on the horizontal length is calculated. 17. The hole vertical guardrails according to length to the factor here is the mouth of the cave, the mouth of the cave network level as shown the mouth of the cave long W width to m2 is calculated. 18. Pick mobile speed by scaffolding of quantities according to the erection of length to the factor is calculated.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...