Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Pick up scaffolding structures cannot be careless - moving speed Jiangsu Shizhan scaffolding engineering co. , LTD

by:Shizhan     2020-09-29
Scaffold is one of the types of scaffolding, moving speed in building top, then you need to pay attention to some detail problems, it is sure can't careless, must be careful, responsible for yourself, and be responsible for construction workers. Therefore set up mobile speed scaffolding, you need to follow certain requirements, the following is a detailed introduction: ( 1) When I answer the scaffold erection of mobile speed, various materials adopted by the need to meet quality requirements. ( 2) Movement speed by scaffolding structures, basic needs and firm, before the erection of the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures. ( 3) Scaffolding, technical requirements should comply with the regulations of relevant specification. ( 4) Need to attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement. ( 5) Level is closed: we should step up, every step or two step, spread the scaffold hand or foot basketry, scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board. ( 6) Vertical closed: from step to step 5, each step must be in the outside vertical rod side set 1. 00 m high protective railings and pedal or set up network, protective pole ( Network) With the stud pin down; Step 5 above in addition to the set a guard rail, set net should be all set its safety or security; In concentration areas or residents along the street, it should step up, outside all are safety basketry set net or security. ( 7) Mobile scaffolding, speed, should be higher than the top of the building or operating level 1. More than 5 m, and added a palisade. ( 8) Of scaffold erection of steel pipes, fasteners, scaffolding and connections shall not be arbitrarily dismantled. When necessary, in the construction needs, with the approval of the site, head, changshu scaffolding, and take effective measures to process is completed, immediately recover.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...