Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Professional aluminum alloy scaffolding phone - shenyang Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan

by:Shizhan     2020-09-07
Shenyang professional aluminum alloy scaffolding and telephone contact number: 18420150310, scaffolding area calculation, area are calculated according to the projection area of the scaffold. Second, if there is a high and low buildings across ( Layer) And cornice height is not the same standard interval, respectively, according to the high and low cross ( Layer) Calculate calculate scaffolding area, respectively, to paraphrase the corresponding project execution. Between the three, highlight the roof water tank, elevator room, stair, closed-circuit television, parapet and so on according to the erection of scaffolding, to paraphrase roof eaves height corresponding project execution. Four, attached to the structure of the outer corridor, eaves gallery, pick out the balcony wall width in 1. Less than 5 m, using exterior frame, calculated based on 80% in scaffolding scaffolding; Pick out the width in 1. More than 5 m, calculated on the scaffold. Five, the independent column by Zhou Changzeng 3. 6 m times column high to corresponding project height, column within 15 m high calculated by single row, column more than 15 m high calculated on double row. Six, laying in the scaffold, calculated according to the interior wall vertical projection area, not deducted from the area of the Windows and doors hole. Masonry wall frame, according to the scaffold project execution in masonry, walls scaffolding to natural ground to the top of the wall height multiplied by the center line length calculation of walls, not deduct gate area of the wall, but independent post laying the scaffold is not increased. Wall built on slopes or paragraphs height is not at the same time, should be calculated based on vertical projection area of paragraphs walls. The fence height more than 3. 6 m, such as double plaster, except in accordance with the provisions, calculate the frame work, can also add a plaster. Seven, and scaffolding, according to the actual erection of the horizontal projection area computation, not accounting attached column, the column of the area, the basic height in 3. More than 6 m to 5. 2 m shall prevail. More than 3. 6 m, 5. Within 2 m of the ceiling plaster and decoration, basic layer should be calculated and the scaffold; The height more than 5. 2 m, each 1. Calculates a 2 m to increase the layer, increase the layer number = ( The height to 5. 2米) / 1. 2 m the nearest integer. Use a full scaffolding for interior wall decoration per vertical projection area of increased to around 100 m2 metope frame 1. 28 man-days. Eight, water transport, applies only to cannot use other scaffolding must tower engineering, at the top of the frame width not less than 2 m can be calculated. When the rack high is less than 1. Within 5 m, 3 m high by frame corresponding project multiplied by the coefficient of 0. 65. The length of the water transportation way, construction organization design or construction scheme, according to the provisions of the construction organization design or construction scheme is calculated. No regulations, according to the actual erection of the length of the calculation. Nine, attachment ramps and independent ramps are calculated according to the seat, the height and the height of the scaffold outside the same. Attachment ramps or independent ramps number, have construction organization design or construction scheme, according to the provisions of the construction organization design or construction scheme is calculated. No regulations, according to the actual erection of counting. Ten, safe corridor, according to the actual erection of the horizontal projection area ( Rack width * length) Calculation. 11, security, basketry, according to the actual closed vertical projection area of calculation. Actual using closed material does not accord with standard, does not make the adjustment. Twelve, slanted type safety basketry set-up (according to the actual Long & amp; 次; Wide) Cant area computation. Thirteen, hang a safety net, according to the actual full hung with vertical projection area of calculation. 14, chimney, water tower scaffold according to different height and diameter to calculate, the diameter of the corresponding + 0. 000 diameter calculation. 15, inverted cone water tower, water tank, aerial prefabricated in the ground, all round its outer scaffold ( Including ramps, hoist frame) , according to the corresponding single calculation, high at the top of the tank to the vertical height of the ground shall prevail. 16 according to the rack, steel latticed truss altitude assembling operation platform, horizontal projection area computation; Height will be subject to 15 m, more than or less than 15 m per 1 increase or decrease. 5 m increase or decrease the dosage. 17, scaffolding, according to the tower of the length and the layer of the factor calculation 18, suspended scaffolding, according to the erection of horizontal projection area of calculate with square metre. ( Content from the Internet) Shenyang professional aluminum alloy scaffolding and telephone
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...