Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Project cost: xi 'an - hot dip galvanized scaffolding manufacturer Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shiz

by:Shizhan     2020-09-05
Xi 'an galvanized scaffolding contact telephone: 184201503101, building facade scaffolding, every design outdoor floor to the eaves, Or a daughter on the wall surface) The masonry under 15 m height, press computation of single scaffold; Building height in more than 15 m or building height is less than 15 m, but exterior Windows and doors and decoration area of more than external wall surface area of more than 60%, are calculated according to the double row scaffolding. 2, building wall scaffolding, every design indoor floor to the roof surface ( 1/2 point) or gable height The building height in 3. Under 6 m, calculated on the scaffold; More than 3 building height. More than 6 m, calculated at single scaffold. 3, stone wall, every building height more than 1 m, calculated on the scaffold. 4, to calculate the interior and exterior wall scaffold, are not deducted from the door, humanly scaled, empty circle hole mouth of the area. 5, the same building height is not at the same time, should according to different height are calculated respectively. 6, cast-in-situ reinforced concrete frame column, beam calculated by double row scaffolding. 7, walls of scaffolding, the natural outdoor floor to the masonry wall top surface height in 3. Under 6 m, calculated on the scaffold; More than 3 building height. More than 6 m, calculated at single scaffold. 8, interior ceiling decoration design interior floor in 3. 6 m above, should be calculated and scaffolding, calculation and scaffolding, metope adornment engineering no longer calculate the scaffold. 9, the slippery rise template construction of reinforced concrete pipe, silos, not the other scaffolding calculation. 10, masonry storage bin, according to the double row scaffolding calculation. 11, water storage, Oil) Pool, large equipment base, every high from floor more than 1. More than 2 m, according to the double row scaffolding calculation. 12, integrated and reinforced concrete foundation, its width more than 3 m, according to its floor area computation and scaffolding. Xi 'an galvanized scaffolding manufacturer
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...