Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Safety scaffolding, be assured that he, you and I, scaffolding, construction scaffolding, construction steel pipe scaffold - Jiangsu Shizhan scaffolding

by:Shizhan     2020-09-28
At first we choose scaffold http://www. atjsj。 Com when choose a you satisfied with the appearance, and then after we determine the good for hanging basket's electric control system for inspection, it also includes the insulation of the electrical system. Then contrast the instruction see if all indexes meet the design requirements. If possible we must carry on the no-load running test of hanging basket, in the process of operation, we are going to check each parts, the running status in the process of test as far as possible let each parts can be a normal run, and see if it is safe and normal operation. Next, we again according to the rated load at different time for loading test, the need to lift and safe self-locking and so on a series of safety test run. If running in the experimental stage hanging basket fall when the safety lock is not whether can achieve self-locking function, if not reached since the lock, need to replace the safety lock and stop the test, this is to examine the hanging basket safety lock.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...