Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Scaffold construction supervision inspection plan ( Two: the cantilever type steel tube - Insulation scaffold - size Industry dynamic - - aluminum alloy scaffolding manufacturer specially

by:Shizhan     2020-08-22
Insulation scaffolding size contact phone number: 18420150310 shenzhen tengda button type aluminum alloy tower is a combination of mobile new aluminum scaffolding, widely used in various construction projects in foreign advanced countries in the indoor and outdoor construction, decoration and various aerial work. First of all, as a qualified personnel to install, need through the national security technology assessment, to master the appropriate professional qualifications, for accident emergency response have full understanding. General multi-storey building exterior wall construction, all is the use of double row scaffolding. Supervision of any construction project, there will be as a third party to supervise the construction quality, the supervision on the job work point is what? Check what is the main way and requirements? For special subcontract engineering scaffold, and what effect? So today to see the supervision inspection of work copy, we will be more understand the focus of the scaffold project. Below we to choose cantilever type steel pipe scaffold engineering scaffold, professional supervision engineer organization verification and on-site inspection for instructions. Cantilever type steel pipe scaffold check points ( A) Construction scheme verification points 1, cantilever scaffold must prepare special construction scheme. Solutions should be design calculation, Including the overall stability, support bar stress calculation) , targeted stronger, more specific disassembly scheme and safety technical measures shall be built, and draw a plane, elevation and different detail drawing. 2, special construction plan, including design calculation must be approved by enterprise technical director have signed it and affixed their seals to the construction. ( 2) Cantilever beam and frame body stability check point 1, the choice of frame outside the active adoption of steel beam or cantilever frame or finalize the truss. 2, cantilever payments or cantilever fixed frame with embedded structure, installation comply with the design requirements. 3, pick to erect stem and cantilever steel connection must be fixed, prevent slippage. 4, the frame body and architecture structure of rigid Rachel, according to the horizontal direction is less than 7 m set one node, and vertical direction is equal to the height body edge and corner 1 m range must be for a node. ( 3) Scaffolding pick frame layer upon layer put with hand, foot foot hand piece shall be in not fine in 18 # lead wire twin parallel tie not less than 4 points, requirements and firm, junction level off, without probe plate, leaving no gaps, foot hand piece should guarantee the intact, the damaged change in time. ( 4) Uniform load construction load pile up and not more than three. 0 kn / M2。 Construction waste or unused materials must keep clear of in time. ( 5) Disclosure and acceptance 1, choose frame must be in accordance with the special construction scheme and design requirements build-up. Set-up and solution of different actual, must with the approval of the department for examination and approval of the original scheme, and to do a good job of change plan in time. 2, pick a demolition must be targeted safety technical clarificaiton, before every ride a pick frame subject to disclosure, disclosure both sides signature formalities. After 3, each pick frame build-up, organize acceptance by the company, good content, and put into use before they hang a qualified brand. Inspection personnel must sign the acceptance certificate, data archive. ( 6) Picking rack bar spacing interval shall not be greater than 1. 8 m, horizontal stud spacing is not more than 1 m, longitudinal spacing is not greater than 1. 5M。 ( 7) Frame body protection 1, pick the outside must be certified by the competent department of construction of qualified check type safety net closed enclosure, safety net with not less than 18 # lead wire hang tight. And safety net should be hung on the pick in the side, must not be net on the outside of the bar. 2, pick and building span is not more than 20 cm, laying standing people. In addition to pick outside, set construction layer 1. 2 m high protective railings and 18 cm outside the kicking, pick the side meet with limb ( Such as the big bay window, door, etc. ) When, also should undertake the corresponding protection. ( Eight) Layer of protection between the pick operation layer and the underlying application qualified safety net or take other measures to block enclosed protection. ( 9) Scaffold material 1, steel tube scaffold should choose 48 mm outside diameter, wall thickness. 3. 5 mm of A3 steel, surface should be smooth, no rust, crack, delamination, indentation, and hard to bend and new steel pipe factory certificate. Should be done before erection of shelf maintenance, cleaning uniform color, beautiful color to the environment. 2, in this engineering scaffolds were more than 25 m, less than 50 m, need to use in line with national standards of qualified steel pipe and fasteners, fastener shall comply with the requirements of steel pipe scaffold standard issued by the ministry of construction, a fastener production license, specifications and steel pipe matching, using malleable cast iron, can not have crack, air hole, shrinkage, sand holes, such as forging deficiency, and should level off, flexible activity place, grip the pole when opening the minimum distance of not less than 5 mm. Steel fasteners the field sampling inspection qualified can be put into use. 3, steel shapes appropriate USES A3 channels or beams. Insulation scaffold dimensions
Looking for a producer to fix your stand truss problems? Then contact the stand truss experts at Jiangsu Shizhan Group Co.,Ltd, offering a wide range of products across the global market. Visit Shizhan Truss to find our best offer!
There is always a question of how to aluminium scaffolding suppliers, but have you ever thought about the price point? Go to Shizhan Truss to get cost effective offer.
When it comes to stand truss stage roof truss, Jiangsu Shizhan Group Co.,Ltd is the name to reckon with. Not only are they best, they are the most experienced as well and provide wide range of services as well as products at affordable prices. Find out more information on Shizhan Truss.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...