Item type of work ( Type of work) Name: scaffolding demolition disclosure content: 1, the demolition field must be set up warning region, hanging eye-catching warning signs. Operators are strictly forbidden in the alert area of the passage or scaffold below continue to organize the construction. The ground monitoring personnel must perform their duties. High-rise building scaffolding demolished, should be equipped with good communication device. 2, carefully check the lifting machinery, including the rigging is safe and reliable. Lifting machinery is not allowed to build on the scaffolding, should be set separately. 3, such as the strong winds, rain, snow and other special climate, should not be for the removal of scaffolding, implementation of dismantling homework at night, should have good lighting. 4, building lock all the Windows must be closed in a cool, not allowed to open or to the overhanging objects. 5, after the demolition of personnel into the post, first check to reinforce the loose parts, clear steps within the layer of material, objects and garbage. Clear all things should be safety to the ground, forbidden from high toss. On June, according to the set-up of the program, the safety net - - - Vertical baffle basketry - - - Protective railings joist - - - Diagonal member - - - - - - - - Rod - even the wall - - - - - - - - - - - - The ledger - - - - - - - - - - - - - A small bar - - - - - - - - - - - - - Stud. 7, do not allow the discrete surface to dismantle or upper and lower two step removed at the same time, Step type) 。 Seriously do it step by step, one rod. 8 and all the wall rod, inclined rod, not isolation, step up measures must with scaffolding layer removed, a simultaneous drop, no first dismantled. All 9, rods and fasteners, in dismantling should be separated, do not allow the bar on fasteners to delivery, or two at the same time remove the ground. 10, all mat spread its demolition, should be erected in the outgoing, carry, prevent from the inside out, after the express garbage objects directly from the high fall injury. 11 welding gas cutting technology must be used within the time, scaffolding, should be strictly in accordance with the requirements of the national special type of work and fire regulations. Should be more professional personnel, equipped with hopper ( Barrels a day). To prevent Mars and cutting splash down. It is forbidden to unlicensed use hange tools. 12, when after the completion of the crystal, you should carefully check posts around the situation, such as finding hidden danger of the position, should be repaired in time or to continue to the end of a program, a position may leave post. 13, to all the rods, fasteners and other objects on the ground, should according to the kind of pile. Disclosure: in the end of the date of by people: year month day note: division ( Component) Engineering safety technical disclosure and subcontractors clarificaiton in this table.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...