Scaffolding demolition of safety education Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan security division

by:Shizhan     2020-09-04
1. The preparing work before dismantling scaffolding shall meet the following requirements: 1) Comprehensive review of scaffolding connection, even the wall rod support system, such as whether conform to the requirements of the structure; 2) According to test results complement dismantling sequence and measures in perfecting the construction organization design, by the competent department approval to implementation; 3) Shall be carried out by unit technical managers to demolish safety technical disclosure; 4) Scaffolding sundries shall be removed and ground obstacles. 2. Dismantle scaffold, shall meet the following requirements: 1) Demolition work should be carried out step by step a top-down, it is forbidden to up and down the homework at the same time; 2) Even the wall bar must be demolished along with step by step a scaffold, forbidden to connect wall bar again after the whole layer or layers of demolition dismantle scaffold; Segmented demolition of elevation difference should not be more than two steps, such as the elevation difference is greater than two steps, should add the wall reinforcing bar; 3) When the scaffolding to lower down the last long the height of the vertical rod ( 6. 5米) Set-up temporary, we should place behind after reinforcement, to dismantle the wall bar; 4) When the scaffolding to staging, discrete surface removal, for not dismantle scaffold at both ends, should press JGJ130 - first 6, 2011. 2. Article 4 (4), 6. 6. (1) of article 3, paragraph 2 of setting wall rod with reinforce and lateral brace. 3. When discharging shall meet the following requirements: 1) All the components are strictly prohibited thrown to the ground
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...