Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Scaffolding is introduced - scaffolding installation standard High quality fiberglass insulation scaffold - Industry dynamic - - aluminum alloy scaffolding manufacturer Focused on aerial work platform

by:Shizhan     2020-09-03
High quality fiberglass insulation scaffolding contact phone number: 18420150310 scaffolding scaffolding installation specification introduced the author: 'scaffolding installation' although the Internet is a construction worker, decorate worker, but we decorate in the family decorating a process to specific understand every step of the way to truly understand your own house. The installation of scaffolding, a direct impact on building the final results. So, small make up today as you tell me the scaffolding installation specification, decorate to raise everyone's safety awareness. Scaffolding installation specification & quot; /> What is the scaffold? Scaffold, which is the construction site for workers operation and solve the vertical and horizontal transportation and erection of all kinds of support, mainly composed of poling, lateral horizontal pole, longitudinal rod, sweeping bar, bracing. Scaffolding sort is more, can be set up in accordance with the purposes, architectural style, form, a solid way, scaffolding rod and the connecting way of stud and material to differentiate species. Installation problem about the scaffolding, our country has introduced the relevant industry standards, namely the construction fastener type steel pipe scaffold safety technical specifications ', interested friends can go to see. Tell me the installation process need to pay attention to below small make up a simple question. Scaffolding installation specification: in scaffolding in accordance with the process, in order for the following programs: foundation treatment to put the chock - put sweeping bar, set up the bar and rod to buckle fastened up longitudinal rod and sweeps the floor with the stud to buckle fastened up lateral horizontal bar button to add temporary brace, Ann two, three, four longitudinal rod set - lateral horizontal pole fastened up - even the wall pole to pick up poling, adding bracing and safety net. In order to ensure the safety of construction, scaffold installation specification requirement is set-up, must cooperate with construction schedule an erection height is less than the adjacent wall more than a step or two. Each after the erection of a scaffold, as stipulated in the specification shall be calibrated step distance, vertical distance, horizontal distance and verticality of stud. Plate must orientate accurately placed online; Plate with not less than 2, wooden plate thickness is 75 mm. Docking fastener adjacent stud shall not be in the same height, stagger distance of 3 m. Began to build, should each interval 6 set across a brace, until a stable after installation, the wall shall be removed depending on the situation. Set-up level with the stud, lateral bracing pole vertical and horizontal pole synchronous build-up, etc. At the master node fixed rod, longitudinal rod, scissors, lateral horizontal, etc. In the center of the square buckle, rotating fastener mutual distance should not be greater than 150 mm. Docking fastener openings should be upward or itself. The end of the bar out of fasteners on the edge of the plate length should be not less than 100 mm. The inside of the foot should build out poling. High quality fiberglass insulation scaffold
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...