Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Scaffolding knowledge: rainy dismantling scaffolding, attention should be paid to the problem Mobile aluminum platform - Industry dynamic - - aluminum alloy scaffolding manufacturer focus

by:Shizhan     2020-09-03
Portable aluminum platform contact phone number: 18420150310 in recent days seems to be we linyi also entered the so-called plum rain season, it rains from time to time, this for our construction caused great influence, also brought a lot of trouble to our construction personnel, in order to make everyone better security construction, as the manufacturer of scaffolding deliberately give you a suggestion, hope can be helpful for you. 1, condole of steel pipe with fastener to the ground should be timely according to the specifications stacked neatly. 2, outside the frame removed before assembling, head of the project by the unit concerned personnel to conduct a comprehensive inspection of scaffold project and the visa confirmation, building construction, and don't need to use, scaffolding shall be dismantled. 3, such as the strong winds, rain, snow, such as climate, cannot undertake the scaffold outside the frame removed. 4, long standing pole, the removal of diagonal should be conducted by two people cooperate, should not be separate operation, should check whether the work is firm, should be added a temporary fixed support when necessary, to prevent the accident. 5, before the demolition of an outer layer should be opening on the remaining materials to remove debris, according to the top-down split after loading first, after the first open order. Scaffolding: aluminum alloy platform
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...