Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

- scaffolding operation safety control measures Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform Jiangsu shizhan Ann

by:Shizhan     2020-09-02
1, the personnel engaged in scaffold erection, maintenance, dismantling operations must hold relevant certificates, mount guard personnel should be regular physical examination, operation must wear safety helmet, wear your seat belt, wear non-slip shoes. 2, scaffolding engineering construction, shall, first of all, by the scaffolding, head of the engineering technology, safety technical disclosure to rack shift operation personnel, and have clarificaiton books, both parties shall sign indicating the date of disclosure after disclosure. 3, set operations, the lateral due and protective measures against falling objects hurtful, when in case of more than six levels of strong winds and rain, fog, snow weather, should stop demolition activities, snow and rain on assignments due and anti-sliding measures, and cleaning snow, the scaffolding discontinued for a long time before the recovery use should be checked before or dismantled, guarantee the safety of operating personnel. Scaffolding in use process should often check, especially after high winds, heavy rain to take more, found the problem when the emergency treatment. 4, homework layer on the construction load should meet the design requirements, shall not be overloaded, shall not be template bracket, cable wind rope, pumping concrete and mortar conveying pipe fixed on the scaffolding, hanging lifting equipment is forbidden. 5, scaffolding demolition must have a project manager or project construction production sign can be demolished, head of the notice, party on. Demolishing scheme should be established before operation, guarantee the stability of the dismantled scaffold in the process of demolition operation should be on the next level, it is strictly prohibited and homework at the same time, the demolition of the bar it is forbidden to throw, should be smooth, or with a tethered, classification piled up finishing off in time, around the working in the demolition of fencing, warning signs, demolition operations ground must have the specialist care, prohibit the operation personnel into the assignments section.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...