Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Scaffolding set-up specification - safety net Mobile scaffolding safety operation - Industry dynamic - - aluminum alloy scaffolding manufacturer Focus - aerial work platform jiang

by:Shizhan     2020-09-04
Mobile scaffolding safety operation contact phone number: 18420150310 scaffolding set-up specification to strictly according to the ministry of construction safety net the provisions construction to prevent a fall accident and the provisions construction projects to prevent collapse of notification ( Build quality [ 2003] No. 82) Working requirements and the construction of higher safety technical specifications '( JGJ80 - 91). Regulations, with emphasis on the following aspects: low engineering before construction, construction project department must carefully study the engineering characteristics, special solutions to prevent a fall accident, ferreting fall hazards in different stages of the construction, working clear of higher security protection measures, such as scaffolding, hoisting in the demolition, template engineering, such as the mouth of the cave side. For all the high safety knowledge of people working in high education; To adopt new technology, new technology, new material and new equipment, according to the provisions of the workers in the related safety technical disclosure. High homework personnel must mount guard after a medical examination. The construction site for workers to provide qualified safety helmet, safety belt and other necessary protective equipment and utensils; When people working in correctly wear and use in accordance with the regulations. Heights, 'before the project principal shall organize relevant departments to sign the acceptance of safety protection facilities after operation. Do a standard safety protection facilities, tools, protective railings to yellow black ( Or red and white) Stripes, such as pieces of cover with yellow ( Or red) The color label. Need to temporary dismantle or changes in safety facilities, the project director approval, and organize relevant departments to sign the acceptance after implementation. Low material hoist shall prepare the installation removal of construction scheme, using the previous experience of qualified after being signed. Material hoist shall be intact stop layer device, the layers of contact to have clear signal and floor. Material increase on material mouth should hold the safety door interlock, and use rope protection device or dock safety device. Opening to go but I should be spread and fixation, two side protective railings and block feet should be set to meet the requirements, with dense mesh type safety net closed on both sides. Material hoist it is strictly prohibited to take people. Construction for external use elevators must be compiled to install remove the construction scheme, using the previous experience of qualified after being signed. A sensitive and reliable construction for external use elevator various limit should be floor door fall measures should be taken to prevent personnel and material, the elevator running up and down stroke should ensure that no obstacle. Elevator in the capsules, cargo, it is forbidden to overload, load should be evenly distributed, prevent lay particular stress on. Mobile operating platform construction scheme shall be compiled according to related regulations, experienced qualified after being signed. Mobile operation platform, stud should be kept vertical, appropriate tightening inward, upper platform operation shall not exceed the foot. Poling and platform at the bottom of the facade shall be respectively set up sweeping rod, scissors to support or brace, solid wood spread application platform, and set up the protective railings and climb the ladder. All kinds of work platform, discharging platform construction scheme shall be compiled according to related regulations, experienced qualified after being signed. Frame body should maintain a stable, shall not be connected to construction scaffolding. Work platform overload is strictly prohibited. Scaffolds shall be compiled according to related regulations construction scheme, experienced qualified after being signed. Homework layer scaffold planks should be laid tightly, lower application AnQuanPing string bag bottom. Scaffolding lateral should use dense mesh type safety net for fully enclosed, there shall not be void. Reliable dense mesh type safety net should be fixed on the frame body. Operation layer scaffold board and the space between the buildings more than 15 cm should be fully enclosed, prevent workers and materials. Workers should have a dedicated channel up and down, can not climb frame body. Attached type lifting scaffolding and other outside hanging scaffold construction scheme shall be compiled according to related regulations, experienced qualified after being signed. Attached type lifting scaffolding and other outside hanging scaffold every promotion, should be by the project manager organize relevant departments to check and accept, experience qualified after being signed, before operation. Attached type lifting scaffolding and other hanging scaffold should set the safe and reliable capsized, prevent falling prevention device, each homework layer frame body lateral protective railings and block feet should be set to meet the requirements. Attached type lifting scaffolding and other hanging scaffold outside the elevator, should care for scaffolding work areas by designated personnel. Low template engineering construction scheme shall be compiled according to related regulations, experience qualified job after being signed. Colligation steel, paint template, template engineering in dismantling templates shall ensure that workers have a foothold, reliable operation shall be in accordance with the provisions set safety protection facilities. Template and its supporting system construction load should be evenly piled up, and shall not exceed the design requirements. The elevator shaft door designed and manufactured according to the requirement of the standard, tools, its height should be 1. 5 m to 1. 8 m range. Elevator well within no more than 10 m shall set up a AnQuanPing net or each floor adopts the rigid closed protection; Install remove AnQuanPing net in elevator shaft or protective facilities, homework personnel should be in accordance with the provisions, wear your seat belt. Around for roofing construction, roofing protective barrier set up to meet the requirements. On the roof seal shall be affixed to the hole, short edge size is greater than 1. 5 m, protective barrier around the hole should be set to meet the requirements, set up the bottom AnQuanPing network. In the slope when large roof, special security measures should be taken. Mobile scaffolding safety operation
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...