Sub-station

 16 years manufacturer for metal truss, mobile stage, aluminium scaffolding, barriers, etc,.

Scaffolding will mark the good six way, scaffolding, construction steel pipe scaffolding, scaffold for indoor decoration Jiangsu Shizhan scaffolding

by:Shizhan     2020-09-28
Scaffolding at http://www. atjsj。 Com in building construction, is an indispensable important tool, one thousand scaffolding fails, often caused many serious injuries. Therefore, for a variety of scaffolding need strict control, will mark the good ten way carefully. : 1, the material, in strict accordance with the procedures stipulated by the quality, specification to choose material. 2, size: need according to the rules of interval size up to set up the pole, cross bar, bridging, railings, etc. : 3, ceiling board needs to be spread, must not have space and probe plate, fly the springboard, and often clear plate sundry, keep clean, flat and level. Wooden plank thickness need up to 5 cm. Scaffolding: 4, bar, lateral and ramps on both sides need to have 1 cm high fence and set net. 5, connection: need scissors and supported by the regulation, higher than 7 cm scaffolding needs and building links and firm, to the scaffold not shake. 6, bearing clearance: scaffolds uniformly distributed load is not more than 270 kg/m2. Pile of bricks on the scaffolding allow only single side put three layers. Used for decoration engineering load of 200 kg/m2. Other scaffolding ( Bridges, hanging basket, mounts, etc. ) It is necessary to determine bearing load, through calculation and test such as overloading should take reinforcement measures in order to ensure safety.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...